Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Oct 6 21:33:15 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6094185
Posted: Jun 13 (19:16)

No Responses Yet
Rail News
1132 views
0

IR Affairs
SCR/South Central
Jun 13 (19:16)   New Rail Over Rail Bridge to Reduce Congestion on Secunderabad-Guntur Route

Exynos9611~   20975 news posts
Entry# 6094185         Tags   Past Edits
Log in to your Sakshi account Create your Sakshi account Forgot Password Create your Sakshi account Reset Password

A new "rail over rail" bridge is being constructed in Pagidipalli, near Secunderabad, to address traffic congestion on the Secunderabad-Kazipeta and Secunderabad-Guntur railway lines. This RORB (Rail Over Rail Bridge) will be 5.5 km long with a 1,400-meter elevated section. The bridge will allow trains travelling from Secunderabad towards Guntur to...
more...
cross the Kazipeta line without the need for stopping, reducing travel time and improving efficiency. The bridge will also accommodate the future expansion of the Secunderabad-Guntur line to two tracks, expected to increase passenger and freight train traffic. Land acquisition for the bridge is already underway, and construction is anticipated to start soon. This project is part of the South Central Railway Zone's efforts to improve railway infrastructure and reduce congestion, especially in light of the anticipated increase in passenger and freight traffic on the Secunderabad-Guntur route.

Secunderabad ke paas Pagidipalli mein ek nayi 'rail over rail' bridge ban rahi hai, jisse Secunderabad-Kazipeta aur Secunderabad-Guntur railway lines par traffic ka jam door hoga. Ye RORB (Rail Over Rail Bridge) 5.5 km lambi hogi aur isme 1,400 meter ka elevated section bhi hoga. Is bridge ki wajah se Secunderabad...
more...
se Guntur ki taraf jaane wali trains Kazipeta line ko cross kar sakegi bina roke, jisse travel time kam hoga aur efficiency badhegi. Is bridge se Secunderabad-Guntur line ko aage chal kar do tracks tak badhane ka bhi plan hai, jis se passenger aur freight trains ki traffic badne ki ummeed hai. Bridge ke liye land acquisition shuru ho chuka hai aur jaldi hi construction shuru hone ki ummeed hai. Ye project South Central Railway Zone ke railway infrastructure ko behtar banane aur congestion ko kam karne ke efforts ka hissa hai, khass kar Secunderabad-Guntur route par passenger aur freight traffic badne ki ummeed ke madde-nazar.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy