Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Oct 3 21:34:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6107704
Posted: Jun 27 (21:36)

No Responses Yet
Rail News
3780 views
0

Metro
Jun 27 (21:36)   Indore Metro Achieves Design Speed of 90 km/h During Trial Run

Exynos9611~   20669 news posts
Entry# 6107704         Tags   Past Edits
Indore Metro: इंदौर सुपर कॉरिडोर में पहली बार 90 की स्पीड में दौड़ी मेट्रो ट्रेन, अब ब्रेकिंग व इलेक्ट्रिसिटी कैमरा की टेस्टिंग

Indore Metro's second trial run was conducted on Tuesday night. The train reached a speed of 90 km/h on the Super Corridor, covering the 5.9 km distance between Gandhi Nagar Station and TCS Chowk in just 3 minutes. This was a significant milestone, as the train had previously been tested at...
more...
speeds ranging from 10 to 25 km/h. The trial run was conducted at the design speed of 90 km/h, although the operational speed for passengers will be 80 km/h. The testing involved running the metro train on the Super Corridor for 3-4 times at 90 km/h. The trial was conducted using a single coach, but a 5-coach set will be used for further testing. The Indore Metro management has planned a commercial run on the Priority Corridor by December. The trial also included testing of the braking system, electrical systems, and cameras. The train's performance at 80 km/h will be evaluated by applying the brakes suddenly. The civil structure, signaling systems, and third rail tracks were also tested. Further testing of the software with the 5-coach set is planned, along with other parameters.

Indore Metro ka dusra trial run Mangalwar ki raat ko hua. Train Super Corridor pe 90 km/h ki speed pe daudi, Gandhi Nagar Station se TCS Chowk tak 5.9 km ka safar sirf 3 minute me poora kiya. Yeh ek bada milestone tha, kyuki train pehle 10 se 25 km/h ki...
more...
speed pe test ki gayi thi. Trial run train ki design speed 90 km/h pe kiya gaya, halanki passengers ke liye operational speed 80 km/h hogi. Testing me Super Corridor pe metro train ko 3-4 baar 90 km/h ki speed pe chalaaya gaya. Trial ek single coach ke saath kiya gaya, lekin aage 5-coach set ke saath further testing hogi. Indore Metro management ne December tak Priority Corridor pe commercial run ki plan banaayi hai. Trial me braking system, electrical systems, aur cameras ki bhi testing hui. Train ki performance 80 km/h pe achanak brake lagaake check ki jaayegi. Civil structure, signaling systems, aur third rail tracks ki bhi testing hui. 5-coach set ke saath software ki testing aage ki jaayegi, aur dusre parameters bhi check kiye jaayenge.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6177596 ★★ 29KeepTravelling^~
4211440 ★★★ 153AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy