Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 16 12:21:53 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6128977
Posted: Jul 18 (17:59)

No Responses Yet
Rail News
26168 views
0

IR Affairs
NER/North Eastern
Jul 18 (17:59)   Elevated Railway Track Project Approved in Kanpur: 14 Level Crossings to be Replaced

AdittyaaSharma^~   73505 news posts
Entry# 6128977   News Entry# 560918         Tags   Past Edits
यूपी सरकार से रेलवे ने मांगी 12 हजार वर्ग मीटर जमीन

The construction of an elevated railway track along the Anwarganj-Mandhana railway line parallel to GT Road in Kanpur has been approved. This project includes the construction of 14 elevated railway crossings from Jarib Chauki to IIT, which will replace existing level crossings. The project's cost has been reduced after the approval...
more...
of the National Planning Group of the Central Government and the advice of the NITI Aayog. The railway board has approved the project and a letter was sent to the Northeast Railway in Gorakhpur on July 2nd. The railway has also requested 12,000 square meters of land from the Uttar Pradesh government for the construction of a new railway station near the CSJM University and other construction work, despite the government's prior commitment to providing the land free of charge. The tendering process for the project will begin in September and the construction of the elevated track will start with a budget of ₹995 crore. The new design for the elevated track involves a single railway line instead of a double line and a girder-supported track instead of a box-shaped viaduct. This will reduce the project's cost and will also include a new elevated station near the university and a loop line for stopping trains. The project will also eliminate the Rawatpur and Kalyanpur railway stations. The elevated track will be built on pillars with a box-shaped section at the beginning and end to facilitate smooth transitions. The project will take three years to complete.

Kanpur mein GT Road ke parallel Anwarganj-Mandhana railway line pe, Jarib Chauki se IIT tak, 14 railway crossings ko elevate karne ke liye DPR ko approve kar diya gaya hai. Is project mein existing level crossings ko replace kiya jaayega. National Planning Group of the Central Government aur NITI...
more...
Aayog ki advice ke baad project ki cost kam ki gayi hai. Railway board ne is project ko approve kiya hai aur 2 July ko Gorakhpur ke Northeast Railway ko ek letter bheja gaya. Railway ne CSJM University ke saamne ek new railway station banane ke liye aur doosre construction work ke liye Uttar Pradesh government se 12,000 square meter land maangi hai, halanki government ne pehle hi is land ko free mein dene ka promise kiya tha. September mein project ke liye tender process start hoga aur 995 crore rupees se elevated track ka construction start hoga. Elevated track ka new design double line ki jagah single line aur box-shaped viaduct ki jagah pillars pe girder rakh kar banaya jaayega. Isse project ki cost kam hogi aur university ke paas ek new elevated station aur train ko rokne ke liye loop line bhi hogi. Project mein Rawatpur aur Kalyanpur railway stations ko bhi remove kiya jaayega. Elevated track ko pillar pe banaya jaayega, starting aur end mein box-shaped section hoga, smooth transition ke liye. Project ko complete hone mein 3 saal lagेंगे.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5968612 ★★★ 47ShivaankVaibhav~
6186110  15Rail_0326~
4948161 ★★★ 43SCoR~
3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186432 ★★★ 43PankajMishra^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy