How Mumbai Metro Line 1 and 3 have been integrated for commuters to manage increased passenger trafficTo handle the increased passenger load due to the new Aqua Line 3 connecting to the Blue Line at Marol Naka, Mumbai Metro Line 1 has implemented several measures. These include creating extra passage space, adding security checkpoints and fare collection gates, installing directional signs, and adjusting escalator directions at Gate...
more... 5 in Marol according to peak hours. The Aqua Line's Gate B1 is located near Line 1's Gate 1A at Techno Marol Naka station. On Tuesday, the Aqua Line saw 20,482 riders by 9 pm.
Naya Aqua Line 3, Blue Line se Marol Naka pe connect ho raha hai, is wajah se Marol pe bahut zyada passengers aane wale hain. Isko handle karne ke liye Mumbai Metro Line 1 ne kai steps liye hain. Isme extra passage space, security checkpoints aur fare collection gates add karna,...
more... directional signs install karna, aur Marol ke Gate 5 pe escalator direction peak hours ke hisab se adjust karna shamil hai. Aqua Line ka Gate B1, Techno Marol Naka station pe Line 1 ke Gate 1A ke paas hai. Mangalwar ko 9 pm tak Aqua Line pe 20,482 logon ne travel kiya.