Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Oct 10 05:01:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6214455
Posted: Yesterday (20:02)

No Responses Yet
Rail News
1091 views
0

Metro
PMRC/Pune Metro
Yesterday (20:02)   SYSTRA MVA Consulting and STUP – RITES Selected as Design Consultants for Pune Metro Phase 1 Extension

Exynos9611~   21223 news posts
Entry# 6214455         Tags   Past Edits
Maha Metro unveils qualified bidders for DDC contract of Pune Metro Phase 1A project

On October 8, 2024, SYSTRA MVA Consulting (India) and STUP – RITES joint venture were selected as the designers for the Pune Metro’s Phase 1 Extension (Phase 1A) project. This contract covers the design of 13 new elevated stations on the Aqua Line (Line-2), including two on the western extension (Line-2A)...
more...
between Vanaz and Chandni Chowk, and eleven on the eastern extension (Line-2B) from Ramwadi to Wagholi. These extensions were approved by the Maharashtra state government in March 2024 with a budget of ₹3,756.58 crore. The design consultants will create and propose alternative designs for all civil, architectural, building services, electrical, and mechanical works associated with these stations. The contract, awarded in July 2023, has a duration of four years and a budget of ₹2.36 crore. The LKT Engineering – FP Project Management JV bid was disqualified. The stations on the Vanaz – Chandni Chowk extension are Kothrud Bus Depot and Chandni Chowk. The Ramwadi – Wagholi extension includes Viman Nagar, Somnath Nagar, Kharadi Bypass, Tulaja Bhavani, Ubale Nagar, Upper Kharadi Road, Wagheswar Temple, Wagholi, Siddharth Nagar, Bakori Phata, and Vitthalwadi. The locations of these 13 stations are subject to change based on satellite imagery available in 2026. This is the third and final design consultancy contract for Pune Metro’s Phase 1 Extension project, further expanding the city's public transport network.

8 October, 2024 ko, SYSTRA MVA Consulting (India) aur STUP – RITES joint venture ko Pune Metro ke Phase 1 Extension (Phase 1A) project ke liye Detailed Design Consultant (DDC-03) contract ke liye qualified bidders ke taur par chuna gaya. Is contract mein Aqua Line (Line-2) par 13 new elevated stations...
more...
ke design ko cover kiya gaya hai, jismein Vanaz aur Chandni Chowk ke beech western extension (Line-2A) par do aur Ramwadi se Wagholi tak eastern extension (Line-2B) par gyaarah stations shamil hain. March 2024 mein Maharashtra state government ne ₹3,756.58 crore ke budget ke saath in extensions ko approve kiya tha. Design consultants in stations se related sabhi civil, architectural, building services, electrical aur mechanical works ke liye alternative designs banayenge aur propose karenge. July 2023 mein award kiya gaya yeh contract, chaar saal ki duration aur ₹2.36 crore ke budget ke saath hai. LKT Engineering – FP Project Management JV ki bid ko disqualify kar diya gaya tha. Vanaz – Chandni Chowk extension par stations Kothrud Bus Depot aur Chandni Chowk hain. Ramwadi – Wagholi extension mein Viman Nagar, Somnath Nagar, Kharadi Bypass, Tulaja Bhavani, Ubale Nagar, Upper Kharadi Road, Wagheswar Temple, Wagholi, Siddharth Nagar, Bakori Phata aur Vitthalwadi shamil hain. 2026 mein available satellite imagery ke aadhar par in 13 stations ki locations mein badlaav ho sakta hai. Yeh Pune Metro ke Phase 1 Extension project ke liye teesra aur final design consultancy contract hai, jisse city ke public transport network ka aur vikaas ho raha hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3270606 ★★★ 400TravelBahanaYou^~
5248097 ★★★ 92Jordan~
1959644 ★★★ 272Arpit~
5335816  13purubaba.ankit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy