You cannot call " very uncomfortable " with SMB. And that too when there are no fast trains between pune and ndls.
.
Have they augmented with 3A coaches when stripped of 3E?
If no, then 80*4 , at least 300 passengers lost their chance to travel to their destinations on either side.