For erection of girders of Foot Overbridge over Azimganj Branch Line No. 01 at Nalhati Station in Khana Jn. - Rampurhat- Sahibganj Loop Line Section, TRAFFIC BLOCK FOR 3 HOURS 20 MINUTES(from 10.50hrs. to 14.10hrs.) will be necessary on 01.09.2013(Sunday)
Consequently, 53007 Katwa-Rampurhat Passenger will be controlled for 60 minutes enroute.
There may be delay in train runing during block period. The block is absolutely essential from the safely point of view as well as smooth running of trains. Inconvenience likely to be caused is regretted.