Is the railways looking at this? Lots of tickets available in this train. Patronisation seems to be very low.......Requests for new trains are being turned down. The least the rlwys can do is to ensure that overall revenues improve through better running of existing trains. The ERS-Delhi Duronto is a classic case. a few more additional stops and this train will definitely help reduce wl in other delhi bound trains. Also can be a good option for passengers from ers-pnvl(mumbai) .
S.No. Date (DD-MM-YYYY) Class - 3A Class -SL
1 24-...
more... 9-2013 RAC4/RAC 4 AVAILABLE 106
2 1-10-2013 AVAILABLE 70 AVAILABLE 238
3 8-10-2013 AVAILABLE 60 AVAILABLE 267
4 15-10-2013 AVAILABLE 115 AVAILABLE 403
5 22-10-2013 AVAILABLE 127 AVAILABLE 416
6 29-10-2013 AVAILABLE 141 AVAILABLE 412