AC-DC conversion 1500V-DC to 25KV-AC Electrification completed in mumbai central railway suburban section.
no need to say anything. the words painted on the wag-7 convey the message clearly to all. the test charge on the KYN-LTT section was carried out successfully on 30-12-2012.
click here