जांच में मिली रांची रेल डिवीजन की खामियांAn investigation into the incident where the overhead wire of the Anand Vihar-Puri Neelanchal Express train snapped has revealed serious negligence by the Ranchi Railway Division. The investigation found that the incident took place 30 minutes before the DRM office's siren was sounded due to a disconnected electrical connection. Additionally, the...
more... accidental relief train, which should have left within 15 minutes of the incident, was delayed by 45 minutes. The relief train encountered brake failure twice on its journey, raising concerns about its maintenance. This resulted in a delay of over two hours on the Muri-Chandil railway line. The investigation highlighted poor coordination and decision-making among officials in the Ranchi Division, which ultimately contributed to the prolonged disruption in train services.
Anand Vihar se Puri jaane wali Neelanchal Express ka overhead wire, pant, toot gaya tha. CRSI ne is incident ki jaanch ki aur pata chala ki Ranchi Railway Division mein bahut bada negligence hai. Jaaanch mein ye bhi pata chala ki incident ke 30 minutes baad DRM office...
more... ka hooter baja, kyunki us hooter ka electric connection disconnected tha. Iske alawa, accidental relief train ko incident ke 15 minutes mein start karna tha, par yeh 45 minutes late hui. Raaste mein yeh train 2 baar brake bind kar gai, jiski wajah se iski maintenance par bhi sawal uth rahe hain. In sabhi wajahon ki wajah se relief train time pe nahin pahunchi aur Muri-Chandil railway line pe train 2 ghanta se zyada rukhi rahi. Ranchi Division ke officers ke beech coordination aur time pe sahi faisla nahin lene ki wajah se yeh sab hua.