Statutory inspection of RE works followed by speed trial at full sectional speed (100 Kmph) in Samdari –Balotra (32RKM/38.5TKM) single line section of Jodhpur Division of NWR completed successfully. With this total commissioning by CORE during (2022-23)stands at 2156RKM/2898.5TKM
#Electrification #Ju #NWR