Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 8 12:12:26 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 543636
Mar 02 (21:17) Chennai Metro Invites Bids for 32 New Train Sets for Phase 2 Project (www.metrorailnews.in)
Metro
CMRL/Chennai Metro
1916 views
0

News Entry# 543636   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... CMRL Reinvites Bids for Chennai Metro Phase 2’s 96 Coach Contract

Chennai Metro Rail Ltd (CMRL) is seeking bids for 32 new train sets for the 116.1 km Chennai Metro Phase 2 project. These trains will be 2.9 meters wide, narrower than previous trains, and will consist of a driving motor car, trailer car, and another driving motor car configuration. The contract...
more...
includes design, manufacturing, supply, testing, commissioning, training, and a 15-year maintenance contract. The trains will be stored in depots located at Madhavaram, Semmancheri, or Poonamalee, but their specific line assignments are yet to be determined. The winning bidder must deliver a 3-coach prototype within 630 days, followed by a staggered delivery schedule for the remaining trains. Phase 2 of the Chennai Metro Project will add 118.9 km of network across 3 corridors.

Chennai Metro Rail Ltd (CMRL) 116.1 km Chennai Metro Phase 2 project ke liye 32 new train sets ke liye bids maang raha hai. Ye trains 2.9 meters wide honge, pehle ki trains se thoda narrow, aur DMC+TC+DMC configuration mein honge, jaha DMC Driving Motor Car hai aur TC Trailer Car...
more...
hai. Contract mein design, manufacturing, supply, testing, commissioning, training, aur 15 saal ka maintenance contract shamil hai. Ye trains Madhavaram, Semmancheri, ya Poonamalee mein located depots mein store kiye jayenge, lekin unka specific line assignments abhi decide nahin hua hai. Jeetne wala bidder 630 dinon ke andar 3-coach prototype deliver karna hoga, aur fir baaki trains ko ek staggered delivery schedule ke mutabiq deliver karna hoga. Chennai Metro Project ka Phase 2 118.9 km ka network add karega, jo 3 corridors mein hoga.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy