Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 15 05:11:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 535991
Jan 02 (20:59) Railway Engineers Restore Tracks After Flood Damage in Tamil Nadu
IR Affairs
SR/Southern
3500 views
0

News Entry# 535991   
  Past Edits
This is a new feature showing past edits to this News Post.
Engineers achieve breakthrough in plugging major breach of railway track near Srivaikuntam

After severe flooding on December 17th, a significant breach in the earthen formation under the railway track near Srivaikuntam on the Tirunelveli-Tiruchendur section washed away 165 meters of track, forcing the Chennai-bound Chendur express with 800 passengers to be stranded for three days. Railway engineers worked around the clock for 10...
more...
days to restore the track, facing challenges with washed-out roads and waterlogged areas. They removed the damaged tracks, packed the bund with heavy machinery, and relayed the tracks with ballast. Restoration works are complete for two sections between Srivaikuntam and Alwar Tirunagari, but the bund between Alwar Tirunagari and Nazareth is still being restored, hampered by night-time work restrictions and a local road blockade. Engineers aim to complete restoration of the 61 km stretch to Tiruchendur by January 5th to resume rail services as soon as possible.

December 17 ko, Srivaikuntam ke paas Tirunelveli-Tiruchendur section pe track ke neeche earthen formation mein bada breach aa gaya tha, jisse 165 meter track wash ho gaya. Isse Chennai jaane wala Chendur express, jisme 800 passengers the, 3 din tak Srivaikuntam station pe stranded reh gaya. Railway engineers ne 10 din...
more...
tak round-the-clock kaam kiya, roads wash hone aur waterlogging ki wajah se kaafi problems aayi. Unhone damaged track ko remove kiya, bund ko heavy machinery se packed kiya, aur track ko ballast se relay kiya. Srivaikuntam aur Alwar Tirunagari ke beech do sections mein restoration kaam complete ho gaya hai, par Alwar Tirunagari aur Nazareth ke beech bund ka restoration abhi bhi chal raha hai, night-time work ki restrictions aur local road blockade ki wajah se problems aa rahi hain. Engineers ka target hai ki 5 January tak 61 km ki stretch tak Tiruchendur tak ka restoration complete ho jaaye, taaki rail services jaldi se jaldi start ho sake.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy