Pics: ये है राजस्थान की सबसे बड़ी रेल सुरंग, 13 साल में पूरा हुआ सुरंग का निर्माणThe construction of Rajasthan's largest railway tunnel, located between Didwana and Indawa villages in the Lalsot area on the Dausa-Gangapur rail project, has been completed. The 2,171-meter-long tunnel, built in the Aravalli mountain range, took 13 years to complete. Train operations on the Dausa-Gangapur rail line will commence soon. The tunnel...
more... features a blast-resistant track, using cement blocks embedded in ballast. Construction began on December 9, 2010. The tunnel's total length is 2.171 kilometers, with a cut-and-cover section spanning 796 meters. The tunnel has a height of 6.15 meters and a width of 5.20 meters.
Dausa-Gangapur rail project pe, Lalsot area mein Didwana se Indawa gaon ke beech, Rajasthan ki sabse badi rail tunnel ka construction pura ho gaya hai. Aravalli mountain range mein bani yeh 2,171 meter lambi tunnel banne mein 13 saal lag gaye. Ab jaldi hi Dausa se Gangapur rail line pe train...
more... chalna shuru ho jaayega. Tunnel mein blast-resistant track bhi gaya hai, yaani track pe rodi ke beech cement ke blocks bhi lagaye gaye hain. Construction 9 December 2010 ko shuru hua tha. Tunnel ki total lambai 2 kilometer 171 meter hai. 796 meter cut-and-cover tunnel bhi hai, jiska height 6.15 meter aur width 5.20 meter hai.