Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 8 08:09:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 543673
Mar 03 (11:26) Chief Electrical Engineer Inspects Electrification Work on Ghazipur Ghat-Sonwal Rail Line (www.livehindustan.com)
IR Affairs
NER/North Eastern
9017 views
1

News Entry# 543673   
  Past Edits
Mar 03 2024 (11:26)
Station Tag: Dildarnagar Junction/DLN added by PraveenSingh8008/815087

Mar 03 2024 (11:26)
Station Tag: Tarighat/TRG added by PraveenSingh8008/815087

Mar 03 2024 (11:26)
Station Tag: Sonwal/SONWL added by PraveenSingh8008/815087

Mar 03 2024 (11:26)
Station Tag: Ghazipur Ghat/GZT added by PraveenSingh8008/815087

Mar 03 2024 (11:26)
Station Tag: Ghazipur City/GCT added by PraveenSingh8008/815087
read full article... गाजीपुर घाट से सोनलव तक विद्युतीकरण कार्य का किया निरीक्षण

On Saturday, Sanjay Singhal, the Chief Electrical Engineer, inspected the electrification work on the new 7.86 km railway line between Ghazipur Ghat and Sonwal. He found the work to be up to standard. The inspection included examining the yard plan, neutral sections, power substations, station working rules, platform clearances, point crossings,...
more...
signaling, earthing track, overhead traction height, block overlap lamps, fouling marks, sand hump, feeder power supply distribution system, and control feeder isolation. Singhal also traveled by tower wagon to inspect the Ghazipur Ghat-Tarighat block section, measuring the traction and overhead line crossings and ensuring the standard distance between the traction line and the high-tension power line. The inspection also covered level crossings, safety equipment in the electrified section, gate men's safety tools, and the proper distance between level crossings and the overhead line, among other details.

Saturday ko, Chief Electrical Engineer Sanjay Singhal ne Ghazipur Ghat se Sonwal tak 7.86 km ki nayi rail line pe hue electrification ka kaam inspect kiya. Unhone kaam ko standard ke anuroop paya. Inspection mein yard plan, neutral section, power sub station, station working rules, platform clearance, point crossing, signalling,...
more...
earthing track, overhead traction ki height, block overlap lamps, fouling marks, sand hump, feeder power supply distribution system, aur control feeder isolation ka jaanch kiya gaya. Singhal ne Ghazipur Ghat-Tarighat block section ka inspection bhi kiya, tower wagon se. Unhone block section traction aur overhead line crossing ka measurement kiya aur traction line se high tension powerline ki standard doori check ki. Rail khand pe padne wale level crossing par double karne aur electrification ke anuroop kiye gaye badlaav ka inspection kiya gaya aur electrified section mein usey hone wala safety equipment ki jaanch ki gayi. Sath hi gate manon ke safety tools ko bhi parakha gaya.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy