Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 8 10:12:00 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 562280
Jul 27 (19:55) Electrification work on Ahmedabad-Udaipur railway line progressing well: NWR PCEE inspects project (divya.bhaskar.com)
WR/Western
25301 views
5

News Entry# 562280   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... ઈલેક્ટ્રીફીકેશનની કામગીરીનું નિરીક્ષણ:રાજસ્થાનના ડુંગરપુરથી હિંમતનગર સુધી NWRની OHE કારમાં PCEE ઈલેક્ટ્રીફીકેશનની કામગીરીનું નિરીક્ષણ કરાયું

The electrification work on the railway line between Ahmedabad and Udaipur is progressing well. The work from Asarva to Himmatnagar has been completed and trials have been conducted. Currently, cabling is being done between Himmatnagar railway station and the outer point. The electrification work from Udaipur to Shamlaji is complete and...
more...
charged, while 80% of the cabling work between Shamlaji and Himmatnagar has been completed. The Principal Chief Electrical Engineer (PCEE) of the North Western Railway (NWR) inspected the ongoing electrification work from Dungarpur in Rajasthan on Saturday. After inspecting the work between Shamlaji and Himmatnagar, the PCEE reached Himmatnagar railway station in the evening. The electrification work is expected to be completed within the next two months.

Ahmedabad se Udaipur railway line pe electrification ka kaam aage badh raha hai. Asarva se Himmatnagar tak ka kaam pura ho gaya hai aur trials bhi ho gaye hai. Abhi Himmatnagar railway station se outer point tak cabling ka kaam chal raha hai. Udaipur se Shamlaji tak electrification ka kaam pura...
more...
ho gaya hai aur charge bhi kar diya gaya hai. Shamlaji se Himmatnagar tak 80% cabling ka kaam pura ho gaya hai. Railway crossing ke aas paas kaam baaki hai. Aage aane wale do mahino mein Asarva se Udaipur tak electrification ka kaam pura ho jaane ki sambhavna hai.

Rail News
23262 views
1

Jul 27 (20:00)
riz339~
riz339~   5599 blog posts
Re# 6138030-1              
Pcce inspection of himatnagar udaipur #electrification
Translate to English
Translate to Hindi

11083 views
2

Jul 28 (08:44)guest
Re# 6138030-2               Past Edits
Himmatnagar udaipur railway line electrification crs done
Translate to English
Translate to Hindi

7639 views
0

Jul 28 (15:41)
virendrasinghc10   29 blog posts
Re# 6138030-3              
@6138030-2  @guest
Kab hua..
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy