Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 13 01:40:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 566271
Aug 23 (09:45) Namo Bharat Rapid Train Expands Operations, Connecting Meerut South to Anand Vihar by December
IR Affairs
4925 views
0

News Entry# 566271   
  Past Edits
This is a new feature showing past edits to this News Post.
Meerut: काम की खबर... नमो भारत को दिसंबर तक शताब्दीनगर से आनंद विहार तक चलाने की तैयारी

The operation of the Namo Bharat rapid train has started from Sahibabad to Meerut South. The train is now being prepared to operate from Shaheednagar to Anand Vihar by December. The train is expected to be operational between Shaheednagar and Anand Vihar by Diwali or New Year. The Delhi-Ghaziabad-Meerut RRTS corridor...
more...
is now operational for a total of 42 kilometers, which includes nine stations from Sahibabad in Ghaziabad to Meerut South in Meerut. The Namo Bharat train operates on the entire section from Sahibabad to Meerut South from 6 am to 10 pm with a frequency of every fifteen minutes. Work on the Partapur and Rithani stations in the city is 90% complete. These stations will be serviced by metro trains rather than the Namo Bharat rapid train. The train will stop at Shaheednagar, which is located approximately six kilometers from Meerut South at Sanjay Van. The laying of track is underway. The 82-kilometer corridor from Delhi to Meerut is expected to be operational by June 2025. The Namo Bharat train is being operated from Sahibabad to Anand Vihar and is expected to be operational between the two stations by December after trial runs are completed.

Namo Bharat rapid train ka operation Sahibabad se Meerut South tak shuru ho chuka hai. Ab December maah tak is train ko Shaheednagar se Anand Vihar tak chalane ki taiyari ki ja rahi hai. Diwali ya Naye saal tak Shaheednagar se Namo Bharat mein safar ki sambhavna hai. Delhi-Ghaziabad-Meerut RRTS corridor...
more...
ab 42 kilometer tak chal raha hai, jismein Ghaziabad ke Sahibabad se Meerut ke Meerut South tak nau stations shamil hain. Sahibabad se Meerut South tak pure section par Namo Bharat trains subah 6 baje se raat 10 baje tak chal rahi hain. Har pandrah minute mein train ki frequency hai. Shahar mein Partapur aur Rithani station par 90% tak kaam poora ho gaya hai. In dono stations par Namo Bharat rapid rail ka nahin, metro train ka padav hoga. Meerut South se karieb chhe kilometer ke Sanjay Van sthit Shaheednagar section par Namo Bharat train rukega. Yahaan track bichhane ka kaam chal raha hai. Delhi se Meerut tak 82 kilometer lamba corridor June 2025 tak chalne ki taiyari hai. Namo Bharat train Sahibabad se ab Anand Vihar tak chalai jaayegi. Is par tez se kaam chal raha hai. Maana ja raha hai ki Shaheednagar aur Anand Vihar mein November tak kaam poora kar liya jaayega. Iske baad trial run hoga aur December tak train ka sanchalan in dono stations ke beech shuru ho jaayega.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy