Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Sep 14 10:24:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 567045
Aug 29 (07:30) Automatic Block Signaling System to Enhance Efficiency on East Central Railway Line
IR Affairs
ECR/East Central
22081 views
1

News Entry# 567045   
  Past Edits
Aug 29 2024 (07:31)
Station Tag: Saidraja/SYJ added by AdittyaaSharma^~/1421836

Aug 29 2024 (07:31)
Station Tag: Sasaram Junction/SSM added by AdittyaaSharma^~/1421836

Aug 29 2024 (07:31)
Station Tag: Gurpa/GAP added by AdittyaaSharma^~/1421836

Aug 29 2024 (07:31)
Station Tag: Manpur Junction/MPO added by AdittyaaSharma^~/1421836

Aug 29 2024 (07:31)
Station Tag: Anugraha Narayan Road/AUBR added by AdittyaaSharma^~/1421836

Aug 29 2024 (07:31)
Station Tag: Pradhankhunta Junction/PKA added by AdittyaaSharma^~/1421836

Aug 29 2024 (07:31)
Station Tag: Pt. DD Upadhyaya Junction (Mughalsarai)/DDU added by AdittyaaSharma^~/1421836
आगे चल रही ट्रेन के एक किमी पीछे दौड़ सकेगी दूसरी ट्रेन

The 417-kilometer long Pandit Deen Dayal Upadhyaya-Gaya-Pradhankhanta railway line under East Central Railway will be equipped with an automatic block signaling system. This system has already been installed on 61.86 kilometers of the line. The automatic block signaling system allows trains to run closer together, improving the efficiency and speed of...
more...
the line. This system is already operational on the Anugraha Narayan Road-Pahleja (23 km) and Manpur-Gurpa (38.86 km) sections. The system is scheduled to be commissioned on the Pandit Deen Dayal Upadhyaya-Saidraja (23.63 km) and Pahleja-Sasaram (13.4 km) sections by the end of September.

East Central Railway ke 417 kilometre lamba Pandit Deen Dayal Upadhyaya-Gaya-Pradhankhanta railway line ko automatic block signaling system se laas kiya jaayega. Ismein 61.86 kilometre railkhaand par system install ho chuki hai. Automatic block signaling system se ek hi route par almost ek kilometer ke antar par ek ke peeche ek...
more...
trains chal sakengi. Isse rail lines par trains ki speed aur number bhi badh sakegi.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy