Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 15 11:51:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 567653
Sep 02 (15:16) Vande Bharat Sleeper Train: Details on the New Train Service Launching in India
IR Affairs
ECR/East Central
15766 views
2

News Entry# 567653   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Patna Junction/PNBE   New Delhi/NDLS  
पटना टू दिल्ली चलेगी पहली वंदे भारत स्लीपर ट्रेन, आठ घंटे में पूरा करेगी सफर, जानें कितना होगा किराया?

Indian Railways is set to launch Vande Bharat Sleeper trains across the country. The first pair of these trains was prepared on Sunday. The first train will run between Patna and Delhi. The first model of the Vande Bharat Sleeper train was unveiled on Sunday, September 1st by Indian Railway Minister...
more...
Ashwini Vaishnaw, who also shared a video of the train on social media. The train will undergo trials for the next 10 days and is expected to be operational for the public within 3 months. The first Vande Bharat Sleeper train will operate between Patna and Delhi, covering the distance at a speed of approximately 160 km per hour. It will consist of 16 coaches and will take 8 hours to reach Delhi from Patna. The train will have a total of 823 berths, significantly more than the 530 seats on the existing Vande Bharat Chair car trains, which have 8 coaches. The Railway Minister stated that the train is designed for middle-class passengers and the fare is expected to be comparable to Rajdhani Express fares. The initial plan is to operate the train for distances ranging from 800 to 1200 km, aiming to make it the preferred choice for overnight journeys. The Vande Bharat Sleeper train is expected to commence operations by December. The coaches are ready, and the train will undergo trials for the next 2 months before being made available for passengers. It's designed for overnight journeys where passengers can board after dinner and reach their destination by breakfast.

Indian Railways aage se poora Bharat mein Vande Bharat Sleeper train chalane wala hai. Pehla set Sunday ko ban gaya. Pehli train Patna se Delhi tak chalegi. Railway Minister Ashwini Vaishnaw ne Sunday, 1st September ko pehla Vande Bharat Sleeper train model dikhaaya aur social media pe video bhi daala....
more...
Next 10 din mein is train ka trial hoga aur 3 mahine mein yeh train aam logon ke liye chalne lagegi. Pehli Vande Bharat Sleeper train Patna se Delhi tak chalegi aur 160 km/h ki speed se chalegi. Isme 16 coaches honge aur 8 ghante mein Patna se Delhi pahuch jayegi. Is train mein 823 berths honge, jo Vande Bharat Chair car train ke 530 seats se kaafi zyada hain. Railway Minister ne kaha ki yeh train middle-class logon ke liye hai aur iska fare Rajdhani train jaisa hi hoga. Shuru mein yeh train 800 se 1200 KM tak chalegi aur raat ki yaatra ke liye yeh sabse accha option banegi. Vande Bharat Sleeper train December tak start ho jayegi. Coaches ban gaye hain aur agle 2 mahine mein trial chalega. Uske baad yeh train passengers ke liye chalne lagegi. Yeh train raat ki yaatra ke liye hai, jaha passengers dinner karke board karenge aur subah breakfast ke time apne destination pe pahuch jayenge.

Rail News
11181 views
3

Sep 02 (16:14)
Mridul^~
Mridul^~   47138 blog posts
Re# 6176311-1              
Is everything OK with our Media houses?

Average Speed will be 125kmph for covering NDLS PNBE in 8 hours.
Translate to English
Translate to Hindi

9517 views
1

Sep 02 (16:36)
SultanpurJnSLN~
SultanpurJnSLN~   1814 blog posts
Re# 6176311-2              
Sab Daru Pike typing kiye hai bhai jii 😂
Translate to English
Translate to Hindi

8544 views
0

Sep 02 (16:49)
techyogi~
techyogi~   327 blog posts
Re# 6176311-3              
bhai aap lo railway ke knowldge rakhne wale log ho
kam se kam IRI pe ye sab mat dala kro..
abhi oscillatoin trial hoga, fir CRS hoga...fir production hoga den chalegi bhai...
abhi its just prototype..ye commercial run me . nahi aayega jab tak ki spare rake na ho..
Translate to English
Translate to Hindi

8644 views
1

Sep 02 (17:07)
kirk781^~   4158 blog posts
Re# 6176311-4              
Impossible. PNBE to NDLS is ~1000 km. To cover in 8 hrs, the train needs to do an average of ~125 kph. The tracks on this route can only take upto 130 kph.Even assuming it's faster than Patna Rajdhani by an hour, that's still 11 hrs of sitting.

It's nothing new. Every rail minister wants to introduce something new to cement his/her legacy and every single one of them has failed in doing do. Sometimes, the basics are all what you need. Maybe, just maybe run a normal Mail/Express train that has
...
more...
decent number of stops, a good combination of GS+SL+AC and people will flock towards it like in the old days.

Translate to English
Translate to Hindi

Rail News
6843 views
1

Sep 02 (17:33)
RCBian
RCBian   164 blog posts
Re# 6176311-5              
1 compliments
Great:Ok
Fake news.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy