Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 6 21:05:56 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 550498
Apr 30 (21:22) Kolkata Metro Orange Line Extension Undergoes Successful Trial Runs (metrorailtoday.com)
Metro
KM/Kolkata Metro
4106 views
0

News Entry# 550498   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Asnoti/AT   Dhakia Tiwari/DOT  
read full article... Kolkata Metro conducts trial runs on Orange Line from Ruby Crossing to Beleghata

Kolkata's metro system expanded its Orange Line on April 28th, with trial runs conducted on the new 4.39 kilometer stretch from Ruby Crossing to Beleghata station. This extension connects the Hemanta Mukhopadhyay station in the south to Beleghata in the north, enhancing connectivity and easing congestion along the EM Bypass corridor....
more...
Two trips were conducted in both directions, meticulously evaluating track fitness, emergency brake functionality, power supply, docking procedures, and station staff responsiveness. The extension allows for an interchange between the Blue Line and Orange Line at Kavi Subhash station, improving travel for commuters. The Commissioner of Railway Safety's inspection provided insights for infrastructure enhancements, ensuring safety and efficiency of the expanded line. The successful trial runs are a significant step in improving Kolkata's metro system, with ongoing efforts to enhance connectivity and commuter experience.

Kolkata ka metro system apna Orange Line ko 28 April ko badha diya. New stretch, jo Ruby Crossing se Beleghata station tak jaata hai, 4.39 kilometers lamba hai. Is extension se south mein Hemanta Mukhopadhyay station aur north mein Beleghata connect ho gaya, EM Bypass corridor pe connectivity aur congestion...
more...
kam hone ka benefit milega. Do trips, up aur down dono directions mein, kiye gaye, aur track fitness, emergency brakes, power supply, docking procedures, aur station staff ki response jaise parameters check kiye gaye. This extension se Blue Line aur Orange Line ke beech Kavi Subhash station pe interchange facility milega, jisse commuters ko travel karna aasaan hoga. Commissioner of Railway Safety ne inspection karke infrastructure enhancements ke liye suggestions diye hain, jisse safety aur efficiency increase hogi. Successful trial runs Kolkata ke metro system mein ek important step hain, aur connectivity and commuter experience ko improve karne ke liye efforts chal rahe hain.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy