MMRDA invites bids for Metro 9 depot at Dongri villageThe Mumbai Metropolitan Region Development Authority (MMRDA) has announced plans to build a metro depot at Dongri Village, near Bhayander, for Metro 9 (connecting Dahisar- Mira Bhayandar). The depot will cost around INR 626 Crore and take 52 months to complete. It will be built on a 59.7-acre plot and have...
more... 40 stabling lines, serving both Metro 9 and Metro 7A (Andheri East to Terminal 2 Airport). The MMRDA estimates an additional cost of INR 250-300 Crore to extend Metro 9 and add 1-2 stations between Subhash Chandra Bose Ground and Uttan, as the Dongri site is 5km away from the initial location.
Mumbai Metropolitan Region Development Authority (MMRDA) ne Dongri Village, Bhayander ke paas, Metro 9 (Dahisar- Mira Bhayandar connect karti hai) ke liye ek metro depot banane ka plan announce kiya hai. Yeh depot INR 626 Crore ka kharcha aayega aur isko banne mein 52 mahine lagenge. Yeh 59.7 acre ke plot...
more... pe banega aur isme 40 stabling lines honge, jo Metro 9 aur Metro 7A (Andheri East se Terminal 2 Airport tak) dono ko serve karenge. MMRDA ka estimate hai ki Metro 9 ko extend karne aur Subhash Chandra Bose Ground aur Uttan ke beech 1-2 stations add karne mein alag se INR 250-300 Crore ka kharcha aayega, kyunki Dongri site pehle wala proposed site se 5km door hai.