Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Thu Sep 12 03:19:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 565657
Aug 18 (09:22) Change in Train-18 Propulsion System Leads to Wastage of Resources
Commentary/Human Interest
NR/Northern
10492 views
0

News Entry# 565657   
  Past Edits
This is a new feature showing past edits to this News Post.
Railways wasted crores on Vande Bharat prototype, finds CAG audit

A change in the propulsion system for the Train-18, a high-speed train similar to the Vande Bharat, led to a significant amount of unused materials and coach shells at the Integral Coach Factory (ICF) in Chennai. The Railway Ministry approved the production of 24 coaches for Train-18 in 2017, and later...
more...
approved a 16-coach prototype in 2018. In 2019, ICF procured propulsion systems and manufactured six coach shells. However, in 2021, the Railways changed the propulsion system design, rendering the previously manufactured components unusable. This resulted in Rs 46 crore worth of materials and six coach shells, costing Rs 8.57 crore, being idled. The CAG report criticized the Ministry for not explaining the reason for the change in the propulsion system, leading to this waste of resources.

Train-18, Vande Bharat jaisa high-speed train ka propulsion system me change hone ki wajah se Chennai ke Integral Coach Factory (ICF) me bahut saara material aur coach shells unused reh gaya. Railway Ministry ne 2017 me Train-18 ke 24 coaches banwane ki approval di thi, aur phir 2018 me 16-coach prototype...
more...
ko approve kiya. 2019 me ICF ne propulsion systems kharide aur 6 coach shells banaye. Par, 2021 me Railways ne propulsion system ka design change kar diya, jisse pehle banaye gaye components ka koi use nahi raha. Isse 46 crore rupees ka material aur 6 coach shells, jinka cost 8.57 crore rupees tha, unused reh gaye. CAG report me Ministry ko is change ke peeche ki wajah batane ke liye criticize kiya gaya hai, jisse itna saara resource waste ho gaya.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy