Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 04:48:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 710648-0
Large Station Board;
Entry# 2032682-0
Scenic; Medium; Platform Pic; Large Station Board;
Entry# 4463899-0

AT/Asnoti (1 PFs)
अस्नोटी
ಅಸ್ನೋಟಿ

Track: Single Electric-Line

Updated: Nov 14 2023 (20:12)
Asnoti railway station is located in Uttara Kannada district of Karnataka, serving the small town of Asnoti. It is a single platform station with basic amenities. A popular stop for those visiting the nearby scenic landscapes and religious sites.

Tourism

**Shri Mahabaleshwar Temple:** A revered Hindu temple dedicated to Lord Shiva, located near Asnoti.
**Sri Ranganathaswamy Temple:** A popular pilgrimage site dedicated to Lord Vishnu, located in nearby Kumta.
**Saptamatrika Temple:** An ancient temple dedicated to seven Hindu Goddesses, located in nearby Karwar.
**St. Mary's Church:** A historic church located in Asnoti, known for its beautiful architecture.
**Asnoti Mosque:** A local mosque serving the Muslim community in Asnoti.

Food

**Shri Krishna Restaurant:** Known for its delicious South Indian vegetarian meals and snacks.
**Annapurna Bhojanalaya:** Serves authentic vegetarian thali meals and a variety of snacks.
**Hotel Asnoti:** Provides a wide variety of vegetarian dishes, including North Indian and Chinese options.
**Sai Veg:** Offers a budget-friendly vegetarian menu with daily specials.
**Swastik Restaurant:** Famous for its fresh and flavorful vegetarian snacks and street food.

Station Address

Asnoti, District: Uttara Kannada. Pin: 581317. Tel: 08382-266360.
State: Karnataka

Elevation: 6 m above sea level
Type: Regular   Category: NSG-6
Zone: KR/Konkan   Division: Karwar


No Recent News for AT/Asnoti
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 21 to 25 of 144 blog entries  <<prev  next>>
Rail News
9000 views
0

Metro
UPMRC/Lucknow Metro
May 30 (20:30)   Kanpur Metro: Pre-cast Structures Casting Completed for Baradevi-Naubasta Elevated Section

Exynos9611~   18670 news posts
Entry# 6079924   News Entry# 554201         Tags   Past Edits
read full article... Kanpur Metro achieves casting milestone at Naubasta Yard for Baradevi-Naubasta stretch

The Kanpur Metro Rail Project has achieved a significant milestone with the completion of pre-cast structure casting for the Baradevi-Naubasta elevated section of Corridor-1 (IIT to Naubasta). This includes all U-girders, I-girders, double T-girders, and pier caps, totaling 348, 64, 264, and 186 respectively. The casting was done at the Naubasta...
more...
casting yard and the final U-girder was cast in April 2024. Managing Director of UPMRC, Shri Sushil Kumar, expressed satisfaction with the progress, highlighting the commitment to quality and speed. The project is also progressing on other sections, including two underground sections of Corridor-1 and the Rawatpur-Double Pulia underground section of Corridor-2.

Kanpur Metro Rail Project mein, Corridor-1 (IIT se Naubasta) ke Baradevi-Naubasta elevated section ke liye, pre-cast structures ke casting ka kaam pura ho gaya hai. Isme sabhi U-girders, I-girders, double T-girders, aur pier caps shamil hain, jinki total number 348, 64, 264, aur 186 hai. Casting Naubasta casting yard mein...
more...
kiya gaya aur final U-girder April 2024 mein cast kiya gaya. UPMRC ke Managing Director, Shri Sushil Kumar ne, is progress pe khushi jataai aur quality aur speed ke liye commitment highlight kiya. Project ke aage ke sections pe bhi kaam chal raha hai, jisme Corridor-1 ke do underground sections aur Corridor-2 ke Rawatpur-Double Pulia underground section bhi shamil hain.
Rail News
3304 views
0

Metro
MAHA/Nagpur Metro
May 25 (22:14)   Five Firms Bid for Package C-11 of Nagpur Metro Phase 2 Project

Exynos9611~   18670 news posts
Entry# 6075804   News Entry# 553636         Tags   Past Edits
read full article... 5 Firms compete for Civil Contract Package C-11 of Nagpur Metro Phase 2

Five civil engineering firms have submitted bids for Package C-11 of the 43.8 km Nagpur Metro Phase 2 project. This package involves building three disjointed viaducts for Reach 2B, Reach 3A, and Reach 4A. These sections were initially planned to be built under separate packages, but were combined into a single...
more...
contract in February 2024. The estimated project cost is ₹1,010 crore with a construction timeline of 1080 days (3 years). Technical bids are currently under evaluation, and the financial bids of the technically qualified firms will be opened later to determine the lowest bidder and contractor for Package C-11. MahaMetro is also evaluating bids for other components of Phase 2, including bids for six stations in Reach 2B (Package C-08) and ten stations in Reach 3A & 4A (Package C-06). The successful completion of Package C-11 is crucial for expanding the Nagpur Metro network and providing improved connectivity and reduced travel time for commuters.

Nagpur Metro Phase 2 project ke liye Package C-11 ke construction ke liye, panch bada civil engineering firms ne bids submit kiya hai. Is package mein Reach 2B, Reach 3A, aur Reach 4A ke liye teen disjointed viaducts banaye jaayenge. Pehle, yeh sections alag-alag packages ke neeche banne wala tha, lekin...
more...
February 2024 mein unko ek single contract mein combine kar diya gaya. Is project ka estimated cost ₹1,010 crore hai aur construction time 1080 days (3 years) hai. Technical bids abhi evaluate kiye ja rahe hai, aur technically qualified firms ke financial bids later khule jaayenge, jisse lowest bidder aur contractor for Package C-11 decide ho payega. MahaMetro Phase 2 ke aur components ke liye bhi bids evaluate kar raha hai, jisme Reach 2B ke six stations (Package C-08) aur Reach 3A & 4A ke ten stations (Package C-06) ke liye bids include hai. Package C-11 ka successful completion Nagpur Metro network ko expand karne ke liye bahut important hai, jisse commuters ke liye better connectivity aur कम travel time milega.
Rail News
6089 views
0

Metro
PMRC/Pune Metro
May 23 (20:46)   Pune Metro Line 3: Three Coaches Arrive, Marking Major Milestone in Project Completion

Exynos9611~   18670 news posts
Entry# 6074102   News Entry# 553455         Tags   Past Edits
read full article... Pune Metro Line 3 to receive first 3-coach metro train in first week of June

Three metro coaches for Pune's Metro Line 3, which runs from Hinjewadi to Shivajinagar, are expected to arrive in Pune by the first week of June. These coaches, manufactured by Alstom in SriCity, Andhra Pradesh, will undergo testing and trials for a month at the Pune metro depot to ensure their...
more...
operational efficiency and safety. Metro Line 3, a 23.5-kilometer line with 23 stations, is being constructed under a public-private partnership model by Pune IT City Metro Rail Limited, a joint venture of the Tata Group and Siemens. The line will connect key locations like Hinjewadi, Wipro Chowk, Shivaji Chowk, Wakad Flyover, and Shivajinagar Court, offering seamless connectivity and reducing travel times. The project also includes a dedicated 55-acre depot in Hinjewadi for maintenance and operations. Construction of a 1.6-kilometer double-decker viaduct along Ganesh Khind Road toward Pune University is also underway. Traffic route changes have been implemented since May 4 to facilitate the rapid installation of girders and construction of pillars. The project has made significant progress in the past two years, with pillar erection complete and testing phases nearing completion. The arrival of the coaches signifies a major milestone toward the launch of Metro Line 3, which will enhance Pune's public transportation system.

Pune ke Metro Line 3, jo ki Hinjewadi se Shivajinagar tak jaata hai, ke liye teen metro coaches June ke pehle hafte mein Pune aane waale hain. Ye coaches, Alstom dwara SriCity, Andhra Pradesh mein banaye gaye hain, aur Pune metro depot par ek mahine tak unka testing aur trials kiya...
more...
jaayega, jisse unki operational efficiency aur safety confirm ho sake. Metro Line 3, jo ki 23.5 kilometer lambi hai aur jisme 23 stations hain, ka construction public-private partnership model ke neeche Pune IT City Metro Rail Limited dwara kiya ja raha hai, jo ki Tata Group aur Siemens ka joint venture hai. Ye line Hinjewadi, Wipro Chowk, Shivaji Chowk, Wakad Flyover, aur Shivajinagar Court jaise key locations ko connect karega, jisse seamless connectivity aur travel time kam hoga. Project mein Hinjewadi mein 55 acre ka dedicated depot bhi hai, jisme maintenance aur operations ki jaayegi. Ganesh Khind Road ke saath Pune University ki taraf, 1.6 kilometer lamba double-decker viaduct ka construction bhi chal raha hai. girders ki rapid installation aur pillars ke construction ko easy banane ke liye, May 4 se traffic route changes ki gayi hain. Project mein last two years mein kaafi progress hua hai, pillars ka erection complete ho chuka hai aur testing phases complete hone waale hain. Coaches ka aana Metro Line 3 ke launch ki taraf ek major milestone hai, jisse Pune ki public transportation system mein improvement aayega.
Rail News
3012 views
0

IR Affairs
May 23 (19:23)   TVEMA and ADJ Engineering Partner to Enhance Railway Safety and Technology in India

Exynos9611~   18670 news posts
Entry# 6073964   News Entry# 553386         Tags   Past Edits
read full article... TVEMA and ADJ Engineering forge Partnership to enhance Railway Safety in India

TVEMA and ADJ Engineering, two companies committed to enhancing railway safety and technology, have entered into a joint venture. This partnership aims to utilize Ground Penetrating Radar (GPR) technology to improve the safety and efficiency of Indian Railways. The joint venture was announced at a signing ceremony held at the ADJ...
more...
Engineering office in Noida. The collaboration will involve the supply of 'Onboard Track and OHE Diagnostics Systems' for the Mumbai Metro MRS1 Project, with the first step being technical discussions with BEML Limited and DMRC. Both companies are known for their expertise in railway infrastructure diagnostics, with ADJ Engineering focusing on procuring technologies for various Indian industries and TVEMA being a global leader in developing and implementing diagnostic systems for railway infrastructure.

India mein railway safety aur technology ko badhaawa dene ke liye, TVEMA aur ADJ Engineering ne ek joint venture kar liya hai. Yeh partnership Ground Penetrating Radar (GPR) technology ka istemal karegi, jisse Indian Railways ki safety aur efficiency badhegi. Noida mein ADJ Engineering ke office mein yeh signing ceremony hua....
more...
Is collaboration mein Mumbai Metro MRS1 Project ke liye 'Onboard Track and OHE Diagnostics Systems' supply ki jaayegi, jiska pehla kadam BEML Limited aur DMRC ke saath technical discussions hoga. Dono companies railway infrastructure diagnostics mein expert hain. ADJ Engineering bahut se Indian industries ke liye technologies procure karta hai aur TVEMA railway infrastructure ke liye diagnostic systems develop aur implement karne mein global leader hai.
Rail News
5361 views
0

Metro
May 18 (20:46)   Gurugram Metro Project Gains Momentum: Tenders for Consultants Announced, Construction Set to Begin

Exynos9611~   18670 news posts
Entry# 6068760   News Entry# 552813         Tags   Past Edits
read full article... Tender floated to appoint General Consultants for ₹5,452 crore Gurugram Metro Extn Project

The Gurugram Metro project, costing ₹5,452 crore, aims to improve connectivity in Gurugram by extending the metro line from Huda City Centre to Cyber Hub, covering 28.5 kilometers with 27 elevated stations. Tenders for consultants have been announced, including a general consultant for ₹135 crore, overseeing procurement, construction, and commissioning, and...
more...
a detailed design consultant for ₹17.68 crore, focusing on the design aspects. Geo-technical surveys are underway. The project is expected to be completed by June 2024 with a design speed of 90 kmph and a maximum speed of 80 kmph. The project includes a spur to the Dwarka Expressway and integration with the existing Rapid Metro. The projected daily ridership by 2051 is estimated to be 1.7 million, highlighting the potential for the metro to become the backbone of Gurugram's public transportation system.

Gurugram mein, ₹5,452 crore ka ambittious metro project chal raha hai, jo Huda City Centre se Cyber Hub tak 28.5 kilometer ki line extend karega, jisme 27 elevated stations honge. Consultants ke liye tenders announce kiye gaye hai, jisme ek general consultant ₹135 crore mein, procurement, construction, and commissioning ka...
more...
kaam dekhta hai, aur ek detailed design consultant ₹17.68 crore mein, design aspects pe focus karega. Geo-technical surveys chal rahe hai. Project June 2024 tak complete hone ki ummeed hai, jiska design speed 90 kmph aur maximum speed 80 kmph hoga. Is project mein Dwarka Expressway tak ek spur bhi hai, aur existing Rapid Metro se integration bhi hai. 2051 tak project mein daily 1.7 million passengers hone ki ummeed hai, jisse metro Gurugram ki public transport system ki backbone ban sakta hai.
Page#    Showing 21 to 25 of 144 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy