Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 6 23:41:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Close-up; Platform Pic; Large Station Board;
Entry# 691367-0
Medium; Platform Pic; Small Station Board;
Entry# 3091409-0


RPO/Rawatpur (1 PFs)
रावतपुर
راوت پور

Track: Single Electric-Line

Updated: Jan 21 (14:18)
Rawatpur Railway Station (RPO) is a small station located on the GT Road (NH 34) in Kanpur, Uttar Pradesh. It has a single platform and offers basic amenities like a waiting room and ticket counters. The station is known for its proximity to the historical Rawatpur Fort, a popular tourist attraction.

Tourism

The Rawatpur Fort is a historical landmark and a popular tourist attraction.
The Hanuman Mandir is a revered temple dedicated to Lord Hanuman.
The Kali Mandir is a sacred temple known for its divine ambiance.
The Jain Temple is a peaceful and serene temple complex.
The Mosque is a beautiful example of Islamic architecture and a place of worship.

Food

Shree Krishna Restaurant is known for its delicious vegetarian thalis and snacks.
Sagar Ratna serves traditional South Indian vegetarian dishes.
Haldiram's offers a variety of vegetarian snacks and sweets.
Bikanerwala provides a wide range of vegetarian fast food options.
Raju Chaat is famous for its mouthwatering chaat and street food.

Station Address

GT Road (NH 34), Rawatpur, KANPUR - 208 002
State: Uttar Pradesh

Elevation: 126 m above sea level
Type: Regular   Category: NSG-5
Zone: NER/North Eastern   Division: Izzatnagar


No Recent News for RPO/Rawatpur
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 16
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.0/5 (22 votes)
cleanliness - poor (3)
porters/escalators - poor (3)
food - average (2)
transportation - average (3)
lodging - average (2)
railfanning - average (3)
sightseeing - poor (3)
safety - average (3)

Station Forum

Page#    Showing 1 to 5 of 95 blog entries  next>>
Rail News
12434 views
0

IR Affairs
NCR/North Central
Aug 24 (22:57)   Kanpur Central Station Overwhelmed by Police Exam Candidates

AdittyaaSharma^~   72978 news posts
Entry# 6167338   News Entry# 566495         Tags   Past Edits
read full article... सेंट्रल पर जुटी भीड़, टॉयलेट में बैठ तय की मंजिल

On Saturday, the second day of the police recruitment exam in Kanpur, Central Station was packed with exam candidates. Trains were overcrowded, making travel difficult for the candidates. The RPF-PAC personnel struggled to control the crowds. The railway administration ran special trains to Khajuraho, Ghaziabad, Jhansi, Mathura, Banda, and Lalitpur to...
more...
accommodate the influx. To manage the surge, the railway administration rescheduled the timing of certain trains like the 04187 and 04298, extended the route of 04103, and added stoppages for four trains including the 12496. The crowds were so overwhelming that even reserve coaches were filled. The RPF deployed teams to manage the situation on platforms. Candidates also faced difficulties at Anwarganj, Rawatpur, Kalyanpur, and Govindpuri stations.

Kanpur mein police bharti exam ke dusre din, Saturday ko, Central Station par exam dene walon ki bhari bheed thi. Trains itni crowded thi ki candidates ko travel mein bahut dikkat hui. RPF-PAC jawan bheed ko control karne mein khub mehnat ki. Railway administration ne Khajuraho, Ghaziabad, Jhansi, Mathura, Banda...
more...
aur Lalitpur jaane ke liye special trains chalaaye. 04187 aur 04298 jaise trains ko resheduled kiya gaya aur 04103 ka route extend kiya gaya. 12496 jaise four trains ko raste ke stations par stoppages diye gaye. Bheed itni zyada thi ki reserve coaches bhi bhar gaye. RPF ne platforms par teams deploy ki. Anwarganj, Rawatpur, Kalyanpur aur Govindpuri stations par bhi bheed ki samasya thi.
Info Update
45916 views
1

Aug 24 (13:04)   05112/Rawatpur - Kasganj Exam Special (UnReserved) | CNB/Kanpur Central (10 PFs)
PrakharYadav^~
PrakharYadav^~   14705 blog posts
Entry# 6166786            Tags   Past Edits
पूर्वोत्तर रेलवे

रेल यात्री बन्धुओं के लिये आवश्यक सूचना

सर्व साधारण को सूचित किया जाता है कि पुलिस भर्ती हेतु परीक्षा विशेष गाड़ियों का संचलन निम्नवत किया जायेगा।
...
more...

गाड़ी सं. 05111/05112 कासगंज-रावतपुर-कासगंज अनारक्षित परीक्षा विशेष गाड़ी

गाड़ी सं. 05111 कासगंज से दिनांक 23-08-2024 से 25-08-2024 एवं 30-08-2024 से 31-08-2024 05 ट्रिप
गाड़ी सं. 05112 रावतपुर से दिनांक 23-08-2024 से 26-08-2024 एवं 30-08-2024 से 01-09-2024 07 ट्रिप

Translate to English
Translate to Hindi
Rail News
16396 views
0

IR Affairs
NER/North Eastern
Aug 09 (23:03)   DRM Inspects Kasganj-Rawatpur Rail Section, Emphasizes Safety at Rawatpur Crossing

AdittyaaSharma^~   72978 news posts
Entry# 6151589   News Entry# 564423         Tags   Past Edits
read full article... डीआरएम ने गुटैया क्रासिंग की तकनीकी खामियों को जाना

The Divisional Railway Manager (DRM) of the Izzatnagar Division of the North Eastern Railway, Rekha Yadav, conducted an inspection of the Kasganj-Rawatpur rail section. She specifically inspected the Rawatpur crossing for safety measures and instructed officials to regularly check the track points. The DRM emphasized the importance of safety at the...
more...
Rawatpur crossing due to its heavy traffic and instructed the gatekeeper to ensure its proper opening and closing to prevent vehicle movement issues. She also instructed engineers to thoroughly inspect track points due to the rainy season.

North Eastern Railway ke Izzatnagar Mandal ki DRM Rekha Yadav ne Kasganj-Rawatpur rail section ka inspection kiya. Unhone Rawatpur crossing pe safety check kiya aur officials ko track points ki regular check karne ka order diya. DRM ne yeh bhi kaha ki Rawatpur crossing pe heavy traffic hai toh safety pe...
more...
dhyaan dena jaruri hai. Unhone gatekeeper ko crossing ko sahi se kholne aur band karne ka instruction diya taki vehicles ko koi problem na ho. Unhone engineers ko bhi rainy season ke wajah se track points ki properly check karne ka order diya.
Rail News
20506 views
0

IR Affairs
NER/North Eastern
Jul 18 (17:59)   Elevated Railway Track Project Approved in Kanpur: 14 Level Crossings to be Replaced

AdittyaaSharma^~   72978 news posts
Entry# 6128977   News Entry# 560918         Tags   Past Edits
read full article... यूपी सरकार से रेलवे ने मांगी 12 हजार वर्ग मीटर जमीन

The construction of an elevated railway track along the Anwarganj-Mandhana railway line parallel to GT Road in Kanpur has been approved. This project includes the construction of 14 elevated railway crossings from Jarib Chauki to IIT, which will replace existing level crossings. The project's cost has been reduced after the approval...
more...
of the National Planning Group of the Central Government and the advice of the NITI Aayog. The railway board has approved the project and a letter was sent to the Northeast Railway in Gorakhpur on July 2nd. The railway has also requested 12,000 square meters of land from the Uttar Pradesh government for the construction of a new railway station near the CSJM University and other construction work, despite the government's prior commitment to providing the land free of charge. The tendering process for the project will begin in September and the construction of the elevated track will start with a budget of ₹995 crore. The new design for the elevated track involves a single railway line instead of a double line and a girder-supported track instead of a box-shaped viaduct. This will reduce the project's cost and will also include a new elevated station near the university and a loop line for stopping trains. The project will also eliminate the Rawatpur and Kalyanpur railway stations. The elevated track will be built on pillars with a box-shaped section at the beginning and end to facilitate smooth transitions. The project will take three years to complete.

Kanpur mein GT Road ke parallel Anwarganj-Mandhana railway line pe, Jarib Chauki se IIT tak, 14 railway crossings ko elevate karne ke liye DPR ko approve kar diya gaya hai. Is project mein existing level crossings ko replace kiya jaayega. National Planning Group of the Central Government aur NITI...
more...
Aayog ki advice ke baad project ki cost kam ki gayi hai. Railway board ne is project ko approve kiya hai aur 2 July ko Gorakhpur ke Northeast Railway ko ek letter bheja gaya. Railway ne CSJM University ke saamne ek new railway station banane ke liye aur doosre construction work ke liye Uttar Pradesh government se 12,000 square meter land maangi hai, halanki government ne pehle hi is land ko free mein dene ka promise kiya tha. September mein project ke liye tender process start hoga aur 995 crore rupees se elevated track ka construction start hoga. Elevated track ka new design double line ki jagah single line aur box-shaped viaduct ki jagah pillars pe girder rakh kar banaya jaayega. Isse project ki cost kam hogi aur university ke paas ek new elevated station aur train ko rokne ke liye loop line bhi hogi. Project mein Rawatpur aur Kalyanpur railway stations ko bhi remove kiya jaayega. Elevated track ko pillar pe banaya jaayega, starting aur end mein box-shaped section hoga, smooth transition ke liye. Project ko complete hone mein 3 saal lagेंगे.
Info Update
59362 views
1

Jul 18 (12:17)   CNB/Kanpur Central (10 PFs)
PrakharYadav^~
PrakharYadav^~   14705 blog posts
Entry# 6128738            Tags   Past Edits
अनवरगंज-मंधना एलिवेटेड रेलवे ट्रैक को मंजूरी, 17 क्रॉसिंग होंगी जाम मुक्त

Amar Ujala CNB edition dated 17 July 2024

#RailNewsbyPY
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 95 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy