Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Jul 11 00:34:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

ALMG/Alamganj (2 PFs)
आलमगंज
আলমগঞ্জ


Track: Construction - Single-Line Electrification

Updated: Mar 24 2023 (09:27) by RailCraze^~
Show ALL Trains
Unnamed Road, Geramari Pt.I , Dist - Dhubri
State: Assam

Elevation: 29 m above sea level
Type: Regular   Category: NSG-6
Zone: NFR/Northeast Frontier   Division: Rangiya


No Recent News for ALMG/Alamganj
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 6 blog entries  next>>
Info Update
7337 views
6

Yesterday (15:43)   BLPA/Bilasipara (2 PFs)
RailCraze^~   3610 blog posts
Entry# 6120338            Tags   Past Edits
Ongoing Electrification materials are there at Bilasipara (BLPA) railway station for the section of GUP-AYU (the most neglected sectionof NFR which was largely unutised for about 3 years after CRS inspection) under Rangiya division of NFR zone. Masts are being unloaded at Bilasipara. All the ground related work have been completed, Now it's time to install those pillars and Masts.💥💥💥💥
......Have a look.....
Translate to English
Translate to Hindi

More Posts
Info Update
15546 views
0

Jul 02 (14:09)   02526/Anand Vihar Terminal - Kamakhya Special Fare SF Special | BLPA/Bilasipara (2 PFs)
RailCraze^~   3610 blog posts
Entry# 6111758            Tags   Past Edits
Plz increase the MPS of BLPA-GUP section. I have recorded 89kmph having orboard train #02526.
Translate to English
Translate to Hindi
Info Update
79243 views
8

Mar 18 (14:31)   BLPA/Bilasipara (2 PFs)
RailCraze^~   3610 blog posts
Entry# 6002199            Tags   Past Edits
3 compliments
Useful Useful Useful
At the initial stage, Ground work for electrification (RE) has been started in this section between GUP-BLPA-AYU under Rangiya division of NFR. The RE work is being operated by NF railway construction organization itself by fixing a time period of 20 months for completion. Let's see how sooner the work get completed. I capture some of snaps at BLPA (Bilasipara) for yours information and those are given below.
#RE_RANGIYA.
Translate to English
Translate to Hindi

More Posts
Info Update
94555 views
5

Feb 01 (18:57)   BLPA/Bilasipara (2 PFs)
RailCraze^~   3610 blog posts
Entry# 5958437            Tags   Past Edits
2 compliments
Useful Great
Gauripur-Bilasipara-Abhayapuri section under RNY division is sanctioned for railway electrification (RE) @ ₹75.31cr.
Translate to English
Translate to Hindi

More Posts
General Travel
171573 views
2

Jul 17 2019 (18:05)   12345/Saraighat Express (PT) | NBQ/New Bongaigaon Junction (7 PFs)
rajivmetal~
rajivmetal~   703 blog posts
Entry# 4380254            Tags   Past Edits
New Bongaigaon to Pancharatna and glimpse of Abhayapuri-Dhubri #NewLine
#Doubling
#Electrification
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 6 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy