Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 12:44:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 931120-0

BEP/Bheerpur (3 PFs)
भीरपुर
بھیرپور

Track: Double Electric-Line

Updated: Jun 30 (19:32)
Bheerpur Railway Station (BEP) is located on the NH-76 in Purani PIN, Uttar Pradesh. It has 3 platforms and serves as a crucial connection for local commuters. Visitors can find basic amenities like waiting rooms and refreshment stalls.

Tourism

The ancient Shiva temple of Bheerpur is a popular pilgrimage site.
The Hanuman temple is known for its peaceful atmosphere.
The Jain temple is a beautiful example of Jain architecture.
The mosque of Bheerpur is a significant place of worship for the Muslim community.
The Gurudwara in the outskirts of the town is visited by Sikh devotees.

Food

Shanti Dhaba offers a wide variety of vegetarian thalis and snacks.
Amritsari Kulcha serves delicious kulchas and chole.
The Vegetarian Kitchen is a popular choice for pure vegetarian food.
Raju's Snacks provides a quick bite of samosas, pakoras, and other Indian snacks.
Biryani House serves a range of vegetarian biryani options.

Station Address

NH 76, Purani PIN 212307
State: Uttar Pradesh

Elevation: 95 m above sea level
Type: Regular   Category: NSG-6
Zone: NCR/North Central   Division: Prayagraj (Allahabad)


No Recent News for BEP/Bheerpur
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 54 blog entries  next>>
Rail News
51089 views
0

IR Affairs
NCR/North Central
Jul 09 (07:21)   Indian Railways Prepares for Record 1200 Special Trains for Maha Kumbh Mela

AdittyaaSharma^~   73037 news posts
Entry# 6119081   News Entry# 559539         Tags   Past Edits
read full article... Prayagraj : महाकुंभ में इस बार स्पेशल ट्रेन के रूप में मेमू भी चलेगी, कानपुर, दिल्ली से लाए जाएंगे रेक

The Indian Railways is preparing to operate a record 1200 special trains during the Maha Kumbh Mela. They plan to utilize MEMU (Mainline Electric Multiple Unit) trains for a significant portion of these special services. To handle the influx, over two dozen MEMU rakes will be brought in from Delhi,...
more...
Ghaziabad, Kanpur and other locations. Due to limited space at Prayagraj Junction for empty train rakes, they will be parked in the loop lines of smaller stations like Karachna, Bhirpur, Meja Road, Manda Road, Bamrauli, Manauri, Bharwari, Sirathu, Manohargunj, and Syed Saranwa. While MEMU trains usually have 8 coaches, during the Maha Kumbh, most of them will operate with 16 coaches.

Railways ne Maha Kumbh ke mauke par record 1200 special trains chalane ki taiyaari ki hai. Unka plan hai ki is special service mein zyada se zyada MEMU (Mainline Electric Multiple Unit) trains use karein. Is crowd ko handle karne ke liye, Delhi, Ghaziabad, Kanpur aur aur locations se...
more...
do dozen se zyada MEMU rakes yahan laaye jaayenge. Prayagraj Junction pe empty train rakes ko rakhne ke liye jagah kam hai, isliye unhe chhote stations ki loop line mein rakhenge, jaise ki Karachna, Bhirpur, Meja Road, Manda Road, Bamrauli, Manauri, Bharwari, Sirathu, Manohargunj, aur Syed Saranwa. Normal mein MEMU trains mein 8 coaches hote hain, lekin Maha Kumbh ke time pe zyadatar 16 coaches wali hi rahenge.
Site-Related
187132 views
0

May 09 (14:25)   KCN/Karchana (4 PFs)
bsbssf01^
bsbssf01^   1272 blog posts
Entry# 6057943            Tags   Past Edits
Dear Atlas Monitor Please Update Karchana - Jeonathpur Construction : Electric Line Tripling
3rd line work is in progress
Translate to English
Translate to Hindi
0
updating ...
8 wishes
Happy Journey शुभ यात्रा शुभ यात्रा Happy Journey HJ Happy Journey Happy Journey Happy Journey
Trip to LKR in 12368 Vikramshila Express 😍😎

321 Posts

FmtBlog
13175 views
0

Apr 08 (21:16)
GHAZIABAD_WAP7^~
GHAZIABAD_WAP7^~   9929 blog posts
Re# 6022868-322            Tags  
@KCN: Karchana 6 km <--> 3 km @BEP: Bheerpur   129km/h   8m early
@BEP: Bheerpur &131 km/h
Translate to English
Translate to Hindi

FmtBlog
23206 views
0

Apr 08 (21:18)
GHAZIABAD_WAP7^~
GHAZIABAD_WAP7^~   9929 blog posts
Re# 6022868-323            Tags  
@BEP: Bheerpur 1 km <--> 10 km @MJA: Meja Road   130km/h   11m early
@BEP: Bheerpur &130 km/h
Translate to English
Translate to Hindi

More Posts
Rail News
11975 views
0

Other News
NCR/North Central
Mar 02 (23:07)   Bheerpur ROB Construction Takes a Leap Forward, Beam Launched Ahead of Schedule

AdittyaaSharma^~   73037 news posts
Entry# 5985353   News Entry# 543653         Tags   Past Edits
read full article... भीरपुर आरओबी का बीम लांच, निर्माण कार्य ने पकड़ी गति

The construction of the Bheerpur ROB, being built in anticipation of the Maha Kumbh, has progressed significantly. The Setu Nigam launched the beam on the first day of the road closure, allowing construction to accelerate. The ROB is in its final phase, with the topmost portion's beam launch being completed after...
more...
a three-day road closure from March 1st to 3rd. The Setu Nigam team worked overnight to complete the beam launch. The Project Manager, Anirudh Kumar, acknowledged the challenging nature of the task due to traffic disruption. With the beam launch, construction is expected to move quickly, and the Bampore ROB beam launch is scheduled to happen soon.

Maha Kumbh ke liye ban raha Bheerpur ROB ka kaam aage badh gaya hai. Sethu Nigam ne block ke pehle hi din beam launch kar diya. Ab construction kaam jaldi hoga. Bheerpur ROB ka kaam last stage mein hai. Top portion ka beam launch karne ke liye, Setu Nigam ne 1st...
more...
March se 3rd March tak block liya tha. Team ne raat bhar kaam karke beam launch kar diya. Setu Nigam ke Project Manager, Anirudh Kumar ne bataya ki yeh bahut tough kaam tha, aur traffic block se logon ko pareshani hui. Ab construction jaldi hoga, aur Bampore ROB ka beam bhi jaldi launch hoga.
Rail News
9962 views
0

Other News
NCR/North Central
Mar 02 (17:49)   Bheerpur ROB Construction in Prayagraj Reaches Final Stage

AdittyaaSharma^~   73037 news posts
Entry# 5984929   News Entry# 543577         Tags   Past Edits
read full article... भीरपुर आरओबी की बीम लांच, तेज होगा निर्माण कार्य

The construction of the Bheerpur ROB in Prayagraj, being built in anticipation of the Maha Kumbh, has progressed significantly. The final stage of construction involved launching the top beams, for which the Setu Nigam took a block from March 1st to 3rd. The team worked through the night and successfully launched...
more...
the beams by Saturday morning at approximately 6 am. Project Manager Anirudh Kumar from Setu Nigam stated that the task was challenging and required careful execution. He assures that the ROB will be completed soon.

Prayagraj mein Maha Kumbh ke liye ban raha Bheerpur ka ROB, ab ek step aage badh gaya hai. Is ROB ka kaam ab final stage mein hai. Top beams launch karne ke liye Setu Nigam ne 1st March se 3rd March tak block liya tha. Team ne puri...
more...
raat kaam kiya aur Saturday subah 6 baje tak beams launch kar diya. Setu Nigam ke Project Manager Anirudh Kumar ne bataya ki yeh bahut bada aur mushkil kaam tha. Saavdhani se isko pura kiya gaya hai. Wo jaldi hi ROB pura kar lenge.
Page#    Showing 1 to 5 of 54 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy