सोनुवा : थर्ड लाइन पर फिर से रखा पत्थर, हादसा टलाOn Saturday night, stones were placed on the third line joint point number 101A and 101B near the outdoor of Sonuwa railway station on the Howrah-Mumbai rail route of the Chakradharpur railway division. Railway personnel patrolling the tracks noticed the stones on the joint point in time. After this, train operations...
more... on the third line, as well as the main up and down lines, were stopped immediately. The incident is reported to have occurred around 9:45 pm. The news of stones being placed on the joint point at the outdoor of Sonuwa station caused a stir in the Chakradharpur railway division. An RPF team reached the spot from the divisional headquarters at night and investigated the rail track. Meanwhile, train operations on the third line, as well as the up and down main lines, remained suspended from 9:45 pm to 10:05 pm on Saturday. Upon receiving the news of the incident, railway officials reached the spot and removed the stones placed on the joint point. Train operations were then resumed. The RPF is investigating the entire matter. After two such incidents within a week, a special team will now monitor the track and the joint points. It is noteworthy that stones were also placed on the down main line and the third line joint points number 102A and 103 near the outdoor of Sonuwa station on Tuesday night. This is the second such incident within a week. The railway police have not been able to identify those who placed the stones. Since the incident took place near the Sonuwa-Kuirida road, the possibility of the incident being carried out by Naxalites cannot be ruled out. However, the railway police are attributing the incident to mischief-mongers. The intention of the mischief-mongers was to derail trains. However, the vigilance of railway personnel prevented a major incident.
Saturday raat ko, Sonuwa railway station ke outdoor ke paas, Howrah-Mumbai rail route par Chakradharpur railway division ke third line joint point number 101A aur 101B par patthar rakha gaya tha. Track par patrolling kar rahe railway karmchariyon ne samay rehtay joint point par rakha gaya patthar dekh liya. Iske baad,...
more... third line aur main up aur down lines par train operations jaldi se band kar diye gaye. Ye ghatna raat 9:45pm ke karib hui hai. Sonuwa station ke outdoor mein joint point par patthar rakhne ki khabar se Chakradharpur railway division mein afra-tafri mach gayi. Raat mein hi, mandal muख्यालय se RPF ki team ghatna sthala par pahunchi aur rail track ki jaanch ki. Is beech, third line aur up aur down main lines par train operations Saturday raat 9:45pm se 10:05pm tak band rahe. Ghatna ki jaankari par pahunche railway karmchariyon ne joint point par rakha gaya patthar hata diya. Iske baad train operations chaloo kar diya gaya. RPF pure maamle ki jaanch kar rahi hai. Ek hafta ke andar do aise incidents hone par, ab special team track aur joint points ki nigrani karegi. Yaad rahe ki mangalwar raat ko bhi Sonuwa station ke outdoor ke paas down main line aur third line joint points number 102A aur 103 par patthar rakha gaya tha. Ye ek hafta ke andar dusra aisa incident hai. Railway police ab tak patthar rakhne walon ki pehchaan nahi kar payi hai. Chuki ghatna Sonuwa-Kuirida road ke paas hui hai, isliye ghatna Naxalites dwara kiye jaane ki sambhavna se inkaar nahi kiya ja sakta. Halanki, railway police ghatna ko sharaarati tatwon ki kartoot bata rahi hai. Sharaarati tatwon ka mansha train ko bepatri karna tha. Lekin, railway karmchariyon ki sajagta se ek badi ghatna tal gayi.