Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sun Sep 29 10:55:25 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

16530⇒11302/Udyan Express (PT)
उद्यान एक्सप्रेस

KSN/Krishna Junction --> DR/Dadar Central

Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 11302/Udyan Express (PT) JCO 28/07/2024 to 31/07/2024 will be diverted to run via Miraj Jn, Kurduwadi Jn and Pune Jn, thereby skipping stoppage(s) at Daund Jn and Uruli railway stations.
Sat Jul 27, 2024 (08:57AM)
News History
🔹Due to Pre-NI & NI work at Mumbai CSMT & YARD for Extension of Platform 10 & 11 & for provision of Electronic Interlocking, Train no. 11302/Udyan Express (PT) JCO 31/05/2024 will be partially cancelled between Pune - Mumbai CSMT, thereby short terminating at Pune Junction.
Wed May 15, 2024 (09:19AM)
🔹Train no. 11302/Udyan Express (PT) JCO 08/12/2023 to 08/02/2024 will be diverted to run via Penukonda Jn, Nagasamudram and Dharmavaram Jn skipping stoppage at Sathya Sai Prashanti Nilayam (SSPN) railway station.
Fri Dec 01, 2023 (05:49PM)
🔹Train No. 11302 KSR Bengaluru - Chatrapati Shivaji Maharaj Terminus Daily Express leaving from KSR Bengaluru o­n April 20, 2023 will be regulated for 1 hour 35 minutes over Central Railway.
Fri Apr 21, 2023 (04:38PM)
JCO 19.11.2022 will short terminate at Pune (Will Not Run Between Pune & CSMT and will remain Cancelled).
Fri Nov 11, 2022 (02:48PM)
Owing to traffic block in SUR division for commissioning of double line between Bhigwan & Washimbe Train No. 11302 Udyan Express will terminate at Solapur from 04/08 to 08/08
Fri Jul 29, 2022 (08:52PM)
Owing to traffic block in SUR division for commissioning of double line between Bhigwan & Washimbe Train No. 11302 Udyan Express will terminate at Solapur from 04/07 to 08/07
Thu Jul 28, 2022 (01:21PM)
T,no. 11302 Udyan express leaving SBC from 25/05/2022 to 28/05/2022 will be SHORT TERMINATED at SOLAPUR station due to block in Solapur division.
Tue May 24, 2022 (07:31PM)
Train No. 11302 KSR Bengaluru - Chhatrapati Shivaji Maharaj Terminus Udyan Daily Express commencing journey from KSR Bengaluru from 23.03.2022 to 29.03.2022 will be cancelled.
Thu Mar 24, 2022 (05:54AM)
► JCO 23/03/22 to 25/03/22 are cancelled due to Doubling with Electrification work on Hindupur - Penukonda Section.
Tue Mar 22, 2022 (09:24AM)
Coach Composition w.e.f 23.01.2022: |1AC-1| |AC2-3| |AC3-3| |3E-1| |SL-9| |2S-3| |EOG-2| Coach Composition w.e.f 27.04.2022: |1AC-1| |AC2-3| |AC3-3| |3E-2| |SL-8| |2S-3| |EOG-2|
Thu Dec 23, 2021 (08:10PM)
Service restored, now running with reserved coaches
Sat Dec 04, 2021 (03:08PM)
Service restored, now running with reserved coaches & note - S9 and S10 are coaches of D1 and D2 , so please note it while travelling.
Mon Nov 22, 2021 (04:35PM)
5 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sun Jul 01, 1984
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering at SBC , BNC
Updated: Sep 21 (19:00) by kjmwag9hc~
Dep:
Arr:
RSA - Rake Sharing
Rating: 2.9/5 (206 votes)
cleanliness - average (35)
punctuality - good (37)
food - average (33)
ticket avbl - average (36)
u/r coach - average (16)
railfanning - good (30)
safety - average (35)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 UR
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 10
 S8
 11
 M1
 12
 M2
 13
 A1
 14
 A2
 15
 A3
 16
 H1
 17
 B1
 18
 B2
 19
 B3
 20
 UR
 21
 UR
 22
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    50 News Items  next>>
Sep 10 (08:26) Udyan Express: Still a Slow Journey Despite Technological Advancements
Entry# 6184537   
  Past Edits
Sep 10 2024 (08:28)
Station Tag: Mumbai CSM Terminus/CSMT added by MCPNBR~/261443

Sep 10 2024 (08:28)
Station Tag: Pune Junction/PUNE added by MCPNBR~/261443

Sep 10 2024 (08:28)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by MCPNBR~/261443

Sep 10 2024 (08:28)
Train Tag: Udyan Express/11302 added by MCPNBR~/261443

Sep 10 2024 (08:28)
Train Tag: Udyan Express/11301 added by MCPNBR~/261443
In age of superfast trains, Mumbai-bound Udyan Express runs on slow track

The Udyan Express, launched in 1983 as a major railway link between Mumbai and Bengaluru, still takes approximately 24 hours to cover the distance, despite the advancements in train technology and the growth of both cities. The unchanged travel time raises questions about the train's speed and efficiency in the era...
more...
of superfast trains.

1983 mein launch kiya gaya Udyan Express, Mumbai aur Bengaluru ke beech ek major railway link tha. Aaj bhi, is train ko yeh dono cities ke beech ka safar karne mein 24 hours lagte hain, aur yeh bhi tabhi se hai jabse yeh train launch hui thi. Superfast trains aur...
more...
Indian Railways mein technology mein aaye badlaav ke is zamaane mein, is train ka travel time waisa hi rehna, bahut saare sawal uthata hai.

5 Public Posts - Tue Sep 10, 2024

18065 views
2

Sep 10 (11:12)
fanrail
fanrail   105 blog posts
Re# 6184537-6              
Better to run on the Mumbai-Pune-Miraj-Hubli-Bangalore track, since this track is electrified with double line.
Translate to English
Translate to Hindi

Rail News
15749 views
1

Sep 10 (18:58)
Rishi_Shukla^~
Rishi_Shukla^~   1144 blog posts
Re# 6184537-7              
Alternative SF or Garib Rath or Duranto can be started from Mumbai/Pune towards Bangalore
Translate to English
Translate to Hindi

14373 views
0

Sep 10 (22:40)
AishikRivuOriginal1155207
AishikRivuOriginal1155207   3778 blog posts
Re# 6184537-8              
thanks for elaborating my point
Translate to English
Translate to Hindi

12926 views
0

Sep 11 (11:44)
irifan2015~
irifan2015~   2504 blog posts
Re# 6184537-9               Past Edits
Both SUR GTL and MRJ UBL lines are electrified lines. SUR GTL line is shorter compared to MRJ. Mumbai upto GTL is part of Golden quadrangle.
Also, beyond UBL towards Pune, ghat sections and speed restrictions are there, which make it lose.
Translate to English
Translate to Hindi

10833 views
0

Sep 11 (16:34)
RajaRamMohanPandey
RajaRamMohanPandey   89 blog posts
Re# 6184537-10              
i remembering last year 11013 cbe EXP departed at 3.30 five hours late in the morning and reached 6.25 at Pune , Sholapur 10.10 am , Guntakl 16.00 Hrs and Dharmavaram17.45 . After that it tooks 3.20 minutes to reach Chensandra crossing and stopped ,i deboarded there . So one can imagine , the margin time given too much for this train.

i AGREED WITH THE VIEWS OF BUS LOBBEY , THEY WILL NOT ALLOW TO IMPROVE.. OTHERWISE NEW SUPERFAST TRAIN WILL TAKE ONLY 14 HOURS TO COMPLETE THE JOURNEY
Translate to English
Translate to Hindi
May 20 (21:05) Udyan Express Timings Revised at Yadgir Station
IR Press Release
23574 views
0

Entry# 6071069   
  Past Edits
May 20 2024 (21:05)
Station Tag: Yadgir/YG added by DrAbhijay2407/349977

May 20 2024 (21:05)
Train Tag: Udyan Express/11302 added by DrAbhijay2407/349977
Trains:  Udyan Express/11302  
Stations:  Yadgir/YG  
Revision in Timings of Udyan Express at Yadgir

The South Western Railway has announced a revision in the timings of the Udyan Express (train number 11302) at Yadgir station. The new timings were announced on May 20, 2024, through Press Release No. 71.

South Western Railway ne Yadgir station pe Udyan Express (train number 11302) ke timings mein change kiya hai. New timings Press Release No. 71 mein 20 May 2024 ko announce kiye gaye.
ಪ್ರಯಾಣಿಕರ ಗಮನಕ್ಕೆ, ಮೇ-19 ರಿಂದ ಜೂ.2ರವರೆಗೆ ಕರ್ನಾಟಕ ತಲುಪುವ ಮತ್ತು ಹೊರಡುವ ರೈಲುಗಳ ಸಂಚಾರ ರದ್ದು

The South Western Railway has announced partial cancellation of various train services due to double-tracking works between Rau and Dr. Ambedkar Nagar stations in Ratlam division. The Yesvantpur-Dr. Ambedkar Nagar Weekly Express (19302) departing Yesvantpur on May 21 and 28 will be partially cancelled, terminating at Indore Junction instead of Dr....
more...
Ambedkar Nagar. The Dr. Ambedkar Nagar-Yesvantpur Weekly Express (19301) departing on May 19 and 26 will commence from Indore station instead of Dr. Ambedkar Nagar. Travel between Dr. Ambedkar Nagar and Indore is cancelled. The KSR Bengaluru-Chhatrapati Shivaji Maharaj Terminus, Mumbai Udyan Daily Express (11302) departing KSR Bengaluru on May 31 will terminate at Pune instead of Mumbai's CSMT due to safety maintenance and engineering works at Mumbai's Chhatrapati Shivaji Maharaj Terminus. The Chhatrapati Shivaji Maharaj Terminus, Mumbai-KSR Bengaluru Udyan Daily Express (11301) departing KSR Bengaluru on June 1 and 2 will be partially cancelled between CSMT, Mumbai and Pune. The Mysuru Railway Division conducted an inspection of the Subrahmanya-Sakaleshpur railway line to enhance infrastructure in areas prone to natural disasters during the monsoon. A team of officials from various departments, including engineering, operations, signaling, safety, railway electrification, and others, inspected the 56 km stretch between Sakaleshpur and Subrahmanya for potential landslide zones. They found 57 tunnels and 234 bridges within this section. The area had faced challenges in 2018 during heavy rainfall, with 98 landslide incidents reported, requiring 45 days to restore rail services. To prevent similar occurrences, the Mysuru division has prioritized this route, implementing various measures for infrastructure improvements in the 2023-24 financial year. This includes installing rock fall barriers at five key locations along the ghat section to mitigate rock fall hazards. Five vulnerable spots have been reinforced with bolting and boulder net safety systems to prevent rockfalls. Bridges in damaged conditions have been strengthened, and other necessary measures have been taken. One crucial bridge has been reinforced with foundation jacketing, a concrete drain on its side, and strengthened walls. The old bridge connecting the Mani-Puttur highway passing through Puttur town has been reinforced, enabling smooth traffic flow on both sides.

South Western Railway ne Ratlam division mein Rau aur Dr. Ambedkar Nagar stations ke beech double-tracking kaam chalne ki wajah se kai train services ko partially cancel karne ka announce kiya hai. Yesvantpur se May 21 aur 28 ko chalta Yesvantpur-Dr. Ambedkar Nagar Weekly Express (19302) partially cancel ho jaayega...
more...
aur Dr. Ambedkar Nagar ki jagah Indore Junction pe khatam hoga. May 19 aur 26 ko chalta Dr. Ambedkar Nagar-Yesvantpur Weekly Express (19301) Dr. Ambedkar Nagar ki jagah Indore station se start hoga. Dr. Ambedkar Nagar aur Indore ke beech ka journey cancel hai. Mumbai ke Chhatrapati Shivaji Maharaj Terminus pe safety maintenance aur engineering kaam hone ki wajah se May 31 ko KSR Bengaluru se chalta KSR Bengaluru-Chhatrapati Shivaji Maharaj Terminus, Mumbai Udyan Daily Express (11302) Mumbai ke CSMT station ki jagah Pune pe khatam hoga. June 1 aur 2 ko KSR Bengaluru se chalta Chhatrapati Shivaji Maharaj Terminus, Mumbai-KSR Bengaluru Udyan Daily Express (11301) CSMT, Mumbai aur Pune ke beech partially cancel hoga. Mysuru Railway Division ne monsoon mein natural disasters se affected areas mein infrastructure ko better banane ke liye Subrahmanya-Sakaleshpur railway line ka inspection kiya. Engineering, operations, signaling, safety, railway electrification aur other departments ke officials ki team ne Sakaleshpur aur Subrahmanya ke beech ke 56 km stretch pe possible landslide zones ka inspection kiya. Unhone is section mein 57 tunnels aur 234 bridges dekhe. 2018 mein heavy rainfall ke time is area mein bahut saare challenges aaye the, 98 landslide incidents hue the aur rail services ko restore karne mein 45 din lage the. Aise incidents ko rokne ke liye Mysuru division ne is route ko priority diya hai aur 2023-24 ke financial year mein infrastructure improvements ke liye kai measures liye hain. Isme ghat section mein five key locations pe rock fall barriers lagane se rock fall hazards ko kam karne ki koshish ki gayi hai. Five vulnerable spots ko bolting aur boulder net safety systems se reinforce kiya gaya hai, jisse rockfalls nahi honge. Damaged bridges ko strengthen kiya gaya hai aur other necessary measures bhi liye gaye hain. Ek important bridge ko foundation jacketing, side mein concrete drain aur strengthened walls se reinforce kiya gaya hai. Mani-Puttur highway jo Puttur town se jaata hai uske upar se jaane wala old bridge ko strengthen kiya gaya hai, jisse dono taraf smooth traffic flow ho raha hai.
May 17 (21:57) Partial Cancellation of Trains on South Western Railway on May 17, 2024
IR Press Release
46822 views
0

Entry# 6067608   
  Past Edits
May 17 2024 (21:57)
Train Tag: Udyan Express/11302 added by DrAbhijay2407/349977

May 17 2024 (21:57)
Train Tag: Udyan Express/11301 added by DrAbhijay2407/349977

May 17 2024 (21:57)
Train Tag: Mumbai CSMT - Hosapete SF Express/11139 added by DrAbhijay2407/349977

May 17 2024 (21:57)
Train Tag: Hosapete - Mumbai CSMT SF Express/11140 added by DrAbhijay2407/349977

May 17 2024 (21:57)
Train Tag: Yesvantpur - Dr. Ambedkar Nagar Weekly Express/19302 added by DrAbhijay2407/349977

May 17 2024 (21:57)
Train Tag: Dr. Ambedkar Nagar - Yesvantpur Weekly Express/19301 added by DrAbhijay2407/349977
Partial Cancellation of Trains

South Western Railway has announced the partial cancellation of several trains on May 17, 2024. The affected trains include: * Udyan Express (Train No. 11302) * Udyan Express (Train No. 11301) * Mumbai CSMT - Hosapete SF Express (Train No. 11139) * Hosapete - Mumbai CSMT SF Express (Train No. 11140) * Yesvantpur - Dr....
more...
Ambedkar Nagar Weekly Express (Train No. 19302) * Dr. Ambedkar Nagar - Yesvantpur Weekly Express (Train No. 19301)

South Western Railway ne 17 May, 2024 ko kuch trains ko aapse cancel karne ka announcement kiya hai. Affected trains mein hain: * Udyan Express (Train No. 11302) * Udyan Express (Train No. 11301) * Mumbai CSMT - Hosapete SF Express (Train No. 11139) * Hosapete - Mumbai CSMT SF Express (Train No. 11140) * Yesvantpur...
more...
- Dr. Ambedkar Nagar Weekly Express (Train No. 19302) * Dr. Ambedkar Nagar - Yesvantpur Weekly Express (Train No. 19301)
Rail Traffic Disrupted in Bengaluru Division Due to Maintenance Work

Due to maintenance work on the 65A bogey bridge between Sai P Nilayam and Basampalle stations in the Bengaluru Division of the South Western Railway, several trains will be affected from December 8, 2023, to February 8, 2024. Train No. 11302 (Bengaluru to Chhatrapati Shivaji Maharaj Terminus, Mumbai Express) will not...
more...
operate via the Penugonda – Nagasamudram – Dharmavaram route until February 8, 2024. Train No. 16332 (Tirupati to Chhatrapati Shivaji Maharaj Terminus, Mumbai Express) on Saturdays will be diverted and will not stop at specific stations until February 3, 2024. Train No. 11014 (Coimbatore to Lokmanya Tilak Terminus Express) will be diverted and will not stop at specific stations until February 8, 2024. Train No. 11301 (Chhatrapati Shivaji Maharaj Terminus, Mumbai to Bengaluru Express) will be rerouted and will not halt at Sai P Nilayam station until February 7, 2024. Other trains, including 16534, 16532, 16614, 19567, will also be affected by diversions or cancellations.

South Western Railway ke Bengaluru Division mein Sai P Nilayam aur Basampalle stations ke beech 65A bogey bridge pe maintenance ka kaam chal raha hai, jiske wajah se 8 December 2023 se 8 February 2024 tak kai trains affect hongi. Train No. 11302 (Bengaluru se Chhatrapati Shivaji Maharaj Terminus, Mumbai Express)...
more...
8 February 2024 tak Penugonda – Nagasamudram – Dharmavaram route se nahi chalega. Train No. 16332 (Tirupati se Chhatrapati Shivaji Maharaj Terminus, Mumbai Express) Saturday ko divert hoga aur 3 February 2024 tak kuchh stations pe nahi rukega. Train No. 11014 (Coimbatore se Lokmanya Tilak Terminus Express) divert hoga aur 8 February 2024 tak kuchh stations pe nahi rukega. Train No. 11301 (Chhatrapati Shivaji Maharaj Terminus, Mumbai se Bengaluru Express) reroute hoga aur 7 February 2024 tak Sai P Nilayam station pe nahi rukega. 16534, 16532, 16614, 19567 jaise aur bhi trains divert ya cancel hongi.
Page#    50 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy