SRR to MAQ 130 upgradation possible only if it is electrified and sections like AJJ-SBC and JTJ-CBE cannot be upgraded since heavy traffic on these two stretches and even if it upgrades only shatabdis and DD will be benifited only in MAS-BZA stretch all the trains will be benifited