This train should be extend till Ayodhya To Howrah in 8.30 min because varanasi to howrah distance only 679 nd it will be possible in 6.10 hrs from varanasi nd whenever this train extend till Ayodhya then it will be very helpful for economical Boost because 3 devotee cities will be connect nd 8.30hrs not a big issue,,, From AY 05.15 AM, SHG.6.15arr, 6:17 AM dep, BSB 7.45arr, 7:55dep, PT. DDU 7.49AM arr, Dep -7:55 AM, GAYA JN arr 9:55, dep 9:50, Dhanbad arr - 12:30,dep 12:35, Howrah 14:35, Return HW 15:35, DHANBAD 17:04, 17:09, GAYA JN 19:45, 19:47, DDU 21:23, 21:30 BSB 21:45, 21:55, SHG 23:10, 23:12, AY 12:35