Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 16 12:36:29 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6108687
Posted: Jun 28 (23:05)

No Responses Yet
Rail News
105014 views
1

IR Affairs
SER/South Eastern
Jun 28 (23:05)   Amrit Bharat Station Scheme in Ranchi Division Faces Delays

AdittyaaSharma^~   73505 news posts
Entry# 6108687   News Entry# 558118         Tags   Past Edits
अमृत भारत स्टेशन योजना में 17 में से मात्र 5 पर ही तेजी से काम

The Amrit Bharat Station scheme in the Ranchi Railway Division is behind schedule. While the work is progressing at a rapid pace at Ranchi, Namkum, Tatisilwai, Lohardaga, and Ramgarh stations, the rest are only 40-50% complete. The deadline for the work is March 2025. The Prime Minister, Narendra Modi, launched the...
more...
project in February 2024. The scheme is meant to revamp the stations of Balasiring, Govindpur Road, Orga, Tulin, Piska, Bano, Gangaghat, Tatisilwai, Silli, Ramgarh Cantt, Suisa, Namkum, Muri, Jhalida, Lohardaga, Ranchi, and Hatia. Work is progressing rapidly at Ranchi station, focusing on the southern section, including a second entrance, ticket office, parking, and approach road, with the main building yet to be started. At Namkum, the work is focused on platform sheds, waiting rooms, toilets, widening of the entrance, and beautification of the building, with a goods train shed also under construction. The Piska Yard work is yet to commence, with a survey in progress for the Lodhma-Piska bypass line. The Lodhma approach road is complete, and the station building is ready, awaiting internal finishing. In Lohardaga, significant progress has been made in developmental work, especially for passenger facilities, as this line connects to the Tori line, anticipating higher train traffic in the future. A new ramp has been built, replacing the old one, and goods shed and approach road work are in progress. Ramgarh Cantt, also part of the scheme, has seen the completion of a new waiting room replacing the old one, along with extensive electrical work.

Ranchi Rail Mandal mein Amrit Bharat Station Yojana apne target se peeche hai. 17 stations mein se, sirf Ranchi, Namkum, Tatisilwai, Lohardaga aur Ramgarh station pe kaam tezi se chal raha hai. Baaki stations ka makeover 40 se 50 percent hi ho paya hai. March 2025 tak kaam pura karne ka...
more...
target hai. PM Narendra Modi ne February 2024 mein yeh project start kiya tha. Balasiring, Govindpur Road, Orga, Tulin, Piska, Bano, Gangaghat, Tatisilwai, Silli, Ramgarh Cantt, Suisa, Namkum, Muri, Jhalida, Lohardaga, Ranchi aur Hatia stations ko revamp karna hai. Ranchi station pe, south part mein kaam chal raha hai, jismein dusra entrance, ticket counter, parking aur approach road ban rahi hai. Main building ka kaam abhi start nahin hua hai. Namkum mein, platform sheds, waiting room, toilets, entrance ko wider karna aur building ko beautify karna, aur ek goods train shed bana rahe hain. Piska Yard ka kaam start nahin hua hai. Lodhma-Piska bypass line ka survey chal raha hai. Lodhma ki approach road ban chuki hai, aur station building bhi ban chuka hai, bas andar ka kaam baaki hai. Lohardaga mein, development work mein kaafi progress hua hai, khaas karke passenger facilities ke liye. Kyunki yeh line Tori line se connect hoti hai, future mein zyada trains aane ki ummeed hai. Purana ramp hatakar, new ramp banaya gaya hai. Goods shed aur approach road ka kaam chal raha hai. Ramgarh Cantt ko bhi Amrit Bharat scheme ke under develop kiya ja raha hai. Pehle step mein, purane waiting room ko hatakar new waiting room banaya gaya hai, aur electricity ki better facilities bhi di gayi hain.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5968612 ★★★ 47ShivaankVaibhav~
6186110  15Rail_0326~
4948161 ★★★ 43SCoR~
3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186432 ★★★ 43PankajMishra^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy