रेलवे स्टेशन की बिल्डिंग में टपक रहा टॉयलेट का पानी:प्लेटफार्म-6 पर ₹8.57 करोड़ से बनी; जीएम - डीआरएम देखने ही नहीं आतेThe building on Platform 6 at Bhopal Railway Station, constructed in 2019 at a cost of 8.57 crores, has had a persistent leak in its toilets for two years. Despite multiple inspections by high-ranking railway officials, including the DRM and the Zone's GM, the issue remains unresolved. While officials inspect Platform...
more... 1 and the parcel office, the building on Platform 6 is overlooked. The booking office staff has repeatedly complained to the engineering wing, but the problem persists due to a lack of clarity on responsibility between the operating company and the engineering department. The building, inaugurated by MP Sadhvi Pragya Singh in 2019, was equipped with facilities like mobile charging, kiosks, and health ATMs, but these were discontinued within months, and other promised amenities remain unavailable. The drive-in space, also constructed at Platform 6, has been closed since the COVID-19 pandemic.
Bhopal Railway Station pe Platform 6 pe banne wali building me, 2 saal se toilet ka pani tapk raha hai. Building 2019 me 8.57 crore rupees me banai gayi thi. DRM aur Zone ke GM ne bhi station ka inspection kiya, lekin Platform 6 ki building pe dhyan nahin diya. Booking...
more... office ke staff ne engineering wing se shikayat ki, lekin problem solve nahin hui. Building me mobile charging, kiosks aur health ATMs bhi thi, lekin woh bhi band ho gaye. Drive-in space bhi COVID ke baad se band hai.