Bengaluru: BEML Rolls Out First Driverless Metro Trainsets For BMRCLBEML, a leading Indian rail and Metro trainset manufacturer, has inaugurated the prototype production of driverless Metro trainsets for Bangalore Metro Rail Corporation (BMRCL) lines 2 and 6, including the Bengaluru Airport Line. This project, secured in August 2023, is valued at Rs 3,177 crore and involves the design, manufacture, supply,...
more... installation, testing, and commissioning of 53 six-car trainsets. These trainsets, designed and developed in-house by BEML in Bengaluru, feature high-tensile stainless steel construction for durability and safety, along with two roof-mounted air conditioners per car for passenger comfort. They are equipped with an IP-based PA and PIS system for station information, a surveillance system, and LCD-based route map displays. Passenger safety is enhanced by electrically driven automatic doors synchronized with Platform Screen Doors. The project includes comprehensive maintenance services for up to 15 years under the Bangalore Metro Rail Project Phase 2, 2A, and 2B.
BEML, India mein rail aur Metro trainset banane wala ek bada company, Bangalore Metro Rail Corporation (BMRCL) ke liye driverless Metro trainset ka prototype banane ka kaam shuru kiya hai. Yeh trainsets lines 2 aur 6 ke liye hain, aur isme Bengaluru Airport Line bhi include hai. August 2023 mein aaya...
more... yeh order, Rs 3,177 crore ka hai aur isme 53 trainsets ka design, manufacturing, supply, installation, testing, commissioning aur 15 saal tak maintenance service bhi include hai. Yeh trainsets 6 coaches ke honge, aur Bengaluru mein BEML ke khud ke engineers ne design aur develop kiya hai. Trainsets mein high-tensile stainless steel use kiya gaya hai, jo ki durable aur safe hai. Har coach mein do roof-mounted air conditioners bhi honge, jisse passengers comfortable rahenge. Yeh trainsets mein IP-based PA and PIS system bhi hai, jisse passengers ko station ki information milegi, aur ek surveillance system bhi hai, aur LCD-based route map display bhi hai. Passengers ki safety ke liye, trainsets mein electrically driven automatic doors lagaye gaye hain, jo ki Platform Screen Doors se synchronized hain. Yeh project Bangalore Metro Rail Project Phase 2, 2A, aur 2B ke under aaya hai.