Blog Entry# 1432768
Posted: Apr 17 2015 (22:46)
44 Responses
Last Response: Apr 21 2015 (17:45)
No worries if Hampi is rerouted..thanks
But the reason why i proposed is UBL-SBC can get short distance train connected,can take load of RC and GG if they are running with saturated demand.
2nd reason is GR can get another train in slot of Basava from SBC to GR which is useful to reduce load on YPR-SUR and useful for RC/WADI and other KA regions too...and mind when proposal sent there was no consideration of YPR-Bidar
Its...
more... just my proposal shared